Summary
Overview
Work History
Education
Skills
Timeline
Generic

ADRIAN MARASIGAN

Flatbush, Manukau,Auckland

Summary

Skilled in overseeing rigging operations, ensuring adherence to safety standards and operational efficiency. Managed the positioning of stage scenery and equipment using various lifting devices, while conducting regular inspections to maintain compliance with safety regulations. Coordinated with crane operators and supervised erector crews, enhancing productivity through effective communication and leadership. Developed operational policies that improved workflow accuracy and team performance.

Overview

21
21
years of professional experience

Work History

Structural Rigger/Erector Foreman

Grayson Engineering (2015) Limited
WIRI
01.2023 - Current
  • Ensure that all safety protocols are followed while setting up and operating rigging systems.
  • Conduct risk assessments before each performance or production in order to identify potential hazards associated with the use of lifting devices.
  • Position stage scenery, lighting fixtures, props, and other objects with precision accuracy using hoists, pulleys, winches, lifts, and cranes.
  • Securely attach loads to rigging equipment using clamps, shackles, and other fasteners.
  • Perform regular checks on all cables and ropes used in order to ensure they meet safety standards.
  • Maintained open communication with crane and other equipment operators to smoothly transport loads.
  • Signaled and verbally directed workers engaged in hoisting and moving loads to protect workers and materials.
  • Unloaded materials and arranged in specific locations.
  • Supervised and coordinated erector crews on job sites, ensuring safety and quality of work.
  • Directed crane operators during hoisting operations to ensure safety protocols were followed.
  • Checked material orders against blueprints specifications prior to delivery at job site.
  • Ensured that tools, equipment and materials were available as needed by crews.
  • Maintained a safe working environment by adhering to company policies and procedures regarding safety measures.
  • Provided technical guidance to workers engaged in welding, bolting, cutting, assembling, and fitting structural steel members.
  • Trained new employees in proper use of tools and techniques related to steel erection activities.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Established and enforced procedures and work standards, promoting team performance and safety.

Erector Supervisor /Lifting Supervisor

Frijns Construction Steel Middle East W.L.L
Doha, Qatar
12.2011 - 01.2023
  • Ensured compliance with workplace safety regulations by providing training sessions for all staff members.
  • Developed and maintained a safe working environment, adhering to all safety protocols and regulations.
  • Developed and implemented operational policies and procedures to ensure efficiency and accuracy of workflows.
  • Read and interpret drawings, blueprints and specification.
  • Monitoring the progress and performance of the erection crew in order to ensure the Productivity, Quality and Standards are maintained.
  • Led weekly team meetings to discuss progress, address issues, and plan future actions.
  • Ensured that all lifting personnel were properly trained in accordance with OSHA regulations prior to operating any equipment.
  • Participated in job hazard analyses to identify potential hazards associated with specific tasks or processes related to lifting operations.
  • Maintained records of inspection results and preventive maintenance performed on lifting equipment.
  • Verified that all crane operators had valid certifications before allowing them to operate any type of material handling equipment.
  • Operated machines and equipment to complete work assignments or to assist workers.
  • Inspected equipment, facilities and vehicles regularly to assess safety.

Pipefitter

KENTZ Engineers and Constructors
Toamasina, Madagascar
11.2010 - 05.2011
  • Read blueprints and diagrams to determine the type of pipe and tools needed for each job.
  • Install supports for pipes to keep them in place during installation process.
  • Adjust flow rates within specified limits by changing valve positions or altering lengths of pipe sections.
  • Install, maintain, and repair pipes used in heating, cooling, lubricating, sprinkler systems, manufacturing processes, and waste disposal.
  • Use hand tools such as saws, drills, wrenches, threaders, to perform tasks related to the job at hand.
  • Measure, cut, thread, groove, bend and install piping according to specifications.
  • Assemble and secure pipes by welding joints or using cement or solder.
  • Ensure compliance with safety regulations while performing assigned tasks.
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining.

Fabricator

Q-Con Qatar Engineering & Construction Company
Doha, Qatar
04.2010 - 06.2010
  • Interpreted blueprints to determine job requirements including dimensions and tolerances.
  • Performed grinding operations using grinders or buffers to smooth surfaces after welding.
  • Measured and marked material for cutting or shaping using measuring tools.
  • Maintained a safe work environment by adhering to safety policies and procedures.
  • Performed layout, fitting, and welding of structural steel members to specified tolerances.

Pipefitter

Nasser S. Al Hajri Corp. Industrial Contractors
Jubail, Saudi Arabia
07.2008 - 11.2009
  • Ensure compliance with safety regulations while performing assigned tasks.
  • Read blueprints and diagrams to determine the type of pipe and tools needed for each job.
  • Measure, cut, thread, groove, bend and install piping according to specifications.
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining.
  • Measured and marked pipes for cutting and threading.

Pipefitter /Pipe Layer

Consolidated Contractors Company W.L.L
Rabigh, Saudi Arabia
11.2004 - 10.2005
  • Read blueprints and diagrams to determine the type of pipe and tools needed for each job.
  • Ensure compliance with safety regulations while performing assigned tasks.
  • Fabricated and positioned screw pipe, socket weld pipe, and stainless steel tubing.
  • Managed movement of materials and equipment to different job sites.
  • Read and interpreted specifications, diagrams and blueprints for job.
  • Filled pipes with water or air, observing pressure gauges, and pipes to troubleshoot and locate leaks.

Education

Vocational / Training - Piping

TESDA
Philippines
04-2011

High School Diploma -

Batangas National High School
Philippines
03-2000

Skills

  • Rigging systems
  • Blueprint interpretation
  • Safety compliance
  • Crew supervision
  • Material handling
  • Drilling
  • Site installations
  • Documentation skills
  • Equipment moving
  • Rigging preparation
  • Structural knowledge
  • Teamwork and collaboration
  • Rigging Standards
  • Blueprint reading
  • Signal interpretation
  • Self motivation

Timeline

Structural Rigger/Erector Foreman

Grayson Engineering (2015) Limited
01.2023 - Current

Erector Supervisor /Lifting Supervisor

Frijns Construction Steel Middle East W.L.L
12.2011 - 01.2023

Pipefitter

KENTZ Engineers and Constructors
11.2010 - 05.2011

Fabricator

Q-Con Qatar Engineering & Construction Company
04.2010 - 06.2010

Pipefitter

Nasser S. Al Hajri Corp. Industrial Contractors
07.2008 - 11.2009

Pipefitter /Pipe Layer

Consolidated Contractors Company W.L.L
11.2004 - 10.2005

Vocational / Training - Piping

TESDA

High School Diploma -

Batangas National High School
ADRIAN MARASIGAN