- Kept work areas clean and organized.
- Loaded, unloaded and identified building materials, machinery and tools to distribute tools to appropriate locations.
- Adhered to quality assurance, performance and compliance standards.
- Arrived for work at scheduled time, properly dressed and ready to contribute to team success.
- Used picks and shovels to dig ditches or trenches, backfill excavations and compact and level earth to grade specifications.
- Prepared new construction sites by digging, moving dirt or compacting space.
- Followed industry regulations and local building codes.
- Assisted with post-construction cleanup and maintenance.
- Smoothed and leveled new concrete or other materials.
- Loaded and carried materials to facilitate transport at construction sites.
- Assisted equipment operators in alignment, movement and adjustment of equipment and materials.
- Lubricated and cleaned machines and work tools to maintain optimum performance.
- Placed traffic signs to warn traffic of construction in progress.
- Mopped, brushed and spread paints, cleaning solutions or other compounds over surfaces to clean or provide protection.
- Operated jackhammers or drills to break up concrete or pavement.
References
Name: Colin Thomsen
Phone:
Email: makegood@xtra.co.nz
Position: Manager
Name: Sabi Singh
Phone: 07 839 4740
Email:
Position: Head Chef/ Manager