I have a ‘can-do’ attitude and will drive contracts to a positive outcome regardless of the challenges presented. I wish to obtain a position where I can use my skills and experience to make a real difference to the community and the environment
I could provide support for multiple concurrent priorities, able to establish, maintain and develop effective working relationships with service users, operational teams, delivery partners and colleagues.
I possess a broad range of technical, personal effectiveness and leadership skills and uses rigorous logic and methods to come up with effective solutions to difficult problems. As someone who is comfortable with and able to effectively cope
Rehabilitation and improvement activities for the 61.30 km rural roads in Mannar district, Northern Province – Package 2, encompass various tasks. These include site clearing and excavation, road formation improvement, construction of sub-base, dense graded aggregate base with complete asphalt concrete overlay, drainage construction and improvements, culvert rehabilitation and extension, as well as relocation of utilities.
duties
Led construction of Seletar Link project, overseeing phases including new vehicular bridge to Pulau Punggol Timor and road system integration with TPE. Managed widening of Sungei Punggol bridge, contributing to enhanced regional connectivity. Project valued at $90.4 million, showcasing leadership in infrastructure development.
Contract ER397 is a Design and Build Contract for the expansion of KPE/TPE Interchange and the construction of an arterial road from the expanded interchange to connect to Punggol Central. The contract involves the construction of five vehicular bridges; including two bridges crossing the Sungei Serangoon Reservoir and one across Sungei Blukar, piled roadways constructed on the former municipal landfill area and associated drain works. The work scope also requires the dispose offsite, the waste from the landfill that are excavated in the course of construction.