Hardworking and passionate job seeker with strong organizational skills eager to secure supervisor position. Ready to help team achieve company goals.
Overview
14
14
years of professional experience
Work History
Cable Jointer
North Power
07.2022 - Current
Using specialized tools and equipment to splice, connect, and terminate cables based on project requirements.
Installing, repairing, and maintaining electrical cables, ensuring they meet safety and quality standards.
Working closely with other members of the installation or maintenance team to coordinate activities and ensure project success.
Ensuring that cable installations meet quality standards and comply with relevant regulations and specifications.
Interacting with Supervisor or project managers to discuss project requirements, provide updates, and address any concerns.
Responding to emergency situations, such as power outages or cable failures, and taking prompt action to restore services.
Self-motivated, with a strong sense of personal responsibility.
Proven ability to learn quickly and adapt to new situations.
Worked well in a team setting, providing support and guidance.
Excellent communication skills, both verbal and written.
Demonstrated respect, friendliness and willingness to help wherever needed.
Managed time efficiently in order to complete all tasks within deadlines.
Worked effectively in fast-paced environments.
Organized and detail-oriented with a strong work ethic.
Trade Assistant
Pope Electrical
07.2020 - 07.2022
Maintenance on streetlight networks
Install new streetlights
Being able to operate crane truck
Being able to operate bucket trucks.
Cable Jointer
Unison Contracting
- 06.2020
Be able to manage site to in a safe manner to complete the tasks before time
Replace switchgear and transformers on unison network
Install new transformers and switchgear for new customers
Working on faults on the unison network
Joining cables from 230v-33kv
Good understanding of unison network and how they operate
Able to communicate to other co workers and customers about the task
Understand networks plans and diagrams
Be able to take out permits on HV networks such as access permits and test permit.
Cable Jointer
Northpower
- 01.2018
Jointing/Terminating Cables from Voltages 230v-33KV
Working with different types of cables including PVC,PILC,XLPE,STA and SWA
Being able to understand the way of the network on LV and HV
Can work in Fault Condition to restore power to customers
Able to Link in LV network
Communicating to customers and work colleagues
HV cable testing includes P.I, Step Voltage and check phasing
Be Able to understand the HV network and take out access permits and test permits.
Trainee Service Person
Lend Lease
- 05.2014
Working in a two man crew repairing faulty water meters and water mains
Able to identify hazards in work area and fill hazard ID forms.
Cable Installation Operative/CIM Operator/Foreman
UGL Limited (BBUGL)
08.2012 - 12.2013
Vector Tunnel in Auckland
Installation of 220 Kv XLPE Cable in the tunnel
Driving a specialized machine to install the cable on the cleats
Installing one 1400m of cable into the vector tunnel at a time
Installed in total 27Km of cable in the tunnel
Installing fibre optic cable for monitoring Joint bays
The experience I had gained on the Woodhead project I was selected for the Auckland project
My roles had been expanded whilst I was still a specialist plant operator I was promoted to section forman
My duties are to manage a 6-8 man team installing steelwork cleats and cables within the confines of the tunnel
It is also my duty to ensure all safety and quality checks are being carried out, documenting daily progress and ensuring the program is being achieved
I also attend the weekly engineers meeting to feed back all the information collated within the week.
Cable installation Operative/HLSM Operator
Electricity Alliance East (BBUSL)
01.2010 - 08.2012
Woodhead Tunnel
Installation of 2 x 5km 2500mm2 XLPE cable 2 circuits total cable length install 30 Km and all associated supports cleats & steel work
Utilizing the Tescorp HLSM cable installation machine
Member of the team that built and commissioned the HLSM machine on site after transportation from Australia
Whilst assisting the jointing teams I gained additional knowledge relating to the 400kv jointing the period of time working with the jointing teams was over a 3 month period
Although whilst assisting with the HV testing my role was more of a fetch me carry I found the experience was worthwhile once again I gain an insight into what is needed to test circuits prior to energisation
Assisted in the full commissioning process along side TESCORP engineers
Fully training on all three operating positions and received the relevant certification from Tescorp & BBUS
Installed to date - one circuit (30 drums of 800m lengths) within the Woodhead tunnel
Reconfigured the machine to install the 2nd circuit on the opposite tunnel wall
Supported the Prysmian jointing teams throughout the jointing element of the project
Working with the local SAP and the HV testing team on the final commissioning of the circuit.
General Operative
Neary Construction
06.2009 - 12.2010
Installation of a 6km double circuit two per phase 72 kV rated circuits for a Network Rail connection across agricultural land within a ducted system
Working on the excavation process and installation of the duct system
Insulator at Harris Power Station, McGuire Power Station, Catawba Power Station, Oconee Power Station, Robinson Power Station, Brunswick Power Station, North Anna Power Station, Surry Power StationInsulator at Harris Power Station, McGuire Power Station, Catawba Power Station, Oconee Power Station, Robinson Power Station, Brunswick Power Station, North Anna Power Station, Surry Power Station