Skilled carpenter specializing in steel reinforcement and concrete finishing, recognized for problem-solving abilities and teamwork. Committed to delivering high-quality results and ensuring project timelines are met. Capable professional with outstanding background in applying a strong work ethic to perform daily construction duties. Intelligent in planning tasks by performing simple calculations, safety-minded in following procedures, maintaining organized workspaces, and using tools properly. Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.
2016 - 2017
- Subbed contract for Fletcher.
I worked as part of a big project, which was the Water View Tunnel.
- Installing concrete barriers and finishing.
- Setting up the slip form machine for work.
Levelling concrete also involves using the vibrator tools.
2017
- Subscribed to HEB Construction.
I worked on the extension of the boat ramp at the waterfront in the CBD.
- Form work and concrete for the platform.
- Installing pilings and steel casings inside the piling for concrete pouring.
2018 -2019
- Sub to Fulton Hogan.
I worked at the Ardmore Water Care Plant.
- Renewed the water service reservoirs.
- Form work and building of chambers for the vault.
- Steel fixing on site.
- Install Shutter.
- Concrete work.
2020
- Sub to McConelle Dowell
I worked at the airport site.
- Install the underground fuel line for the Main fuel line for the Plane.
- Making Shutters and Concrete work
2020 - 2022
- Sub McConelle Dowell
I worked on the big project, the 40 million-plus bridge renewal and demolition.
- Install pilings.
Ran a crew for the bridge posts from start to finish, from installing the shutters to steel casings and concrete work.
- Install precast panels to the floor of the bridge.
- Install the handrails along the bridge.
- Concrete work was to form and pave a sidewalk along the bridge.
- Worked until the opening ceremony of the bridge and completion.
2022 - 2023
- Sub to Downer Group.
I worked in the CBD part of the biggest underground tunnel project for City Rail Link.
- Ran a crew to install precast panels for the roofing of the tunnel.
Made shutters for the wall of the tunnels, and also installed them.
- Concrete work, remedial work, and some steel work.