Work History
Material Processing
Uniplas NZ Limited
12.2022 - Current
Preparing materials according to the job sheet
Refilling materials to complete the job
Quality checking product as it comes off the machine
Trimming the plastic
Assembling small parts
Packing product into boxes
Reporting shortage of materials for upcoming scheduled jobs
Cleaning machine surroundings and material mixing area
Setting up the doser settings for more accurate colour mixture
Project Supervisor
Mobicon Networks
05.2022 - 07.2022
Daily Deployment Plan
Support remote 2G/3G/4G/5G alarm clearing to on-site technicians
Attend meeting with the customer to resolve urgent issue/s on site
Motivate and support all teams to meet all plan activities
Report achievements and concerns to the Project Manager
Project: Huawei - Smart Close-out Project
Site Supervisor
Lserv Corporation assigned to Ericsson Telecommunication Inc.
01.2021 - 03.2022
End to end project supervision and implementation including permitting, site survey, materials delivery/receiving, installation, commissioning, integration/migration, rectification, and acceptance
Manage subcontractor
Impose safety, QA/QC on-site
Provide technical assistance to subcontractors in site installation and troubleshooting
Monitors project progress and collaborate with Project Manager to explore and develop strategies
Eltek rectifier commissioning and external alarm simulation
Collabera Technologies Private Ltd. Inc assigned to Ericsson Telecommunication Inc.
06.2019 - 12.2020
End to end project supervision and implementation including permitting, site survey, materials delivery/receiving, installation, commissioning, integration/migration, rectification, and acceptance
Manage subcontractor
Impose safety, QA/QC on-site
Provide technical assistance to subcontractors in site installation and troubleshooting
Monitors project progress and collaborate with Project Manager to explore and develop strategies
Eltek rectifier commissioning and external alarm simulation
Project: Ericsson - Smart SNCR Close-out Project (June 2019 – October 2020)
Site Engineer
Primus @ Knowledge Specialist assigned to Huawei Technologies Philippines Inc.
04.2012 - 03.2019
End to end project supervision and implementation including permitting, site survey, materials delivery/receiving, installation, commissioning, integration/migration, functionality testing, rectification, and acceptance
Manage subcontractor
Impose safety, QA/QC on-site
Provide technical assistance to subcontractors in site installation and troubleshooting
Monitors project progress and collaborate with Project Manager to explore and develop strategies
Project: Globe Expansion Project (L18/L26/L7/U21), June 2016 – July 2019
RF Technician/TI Team Leader
Al Batin LeBlanc Telecommunication Systems Ltd.
03.2009 - 03.2011
Installation of Nokia Mini UltraSite BTS
Installation and alignment of Nokia Flexi hopper (M/W) PDH links
Installation of 2G (900 and 1800) Flexi EDGE BTS
Installation of 3G Node B
Installation, testing, and troubleshooting of external alarms
Installation of feeder cables (1/2,7/8 and 1 5/8), connectors and jumper cables for panel antennas
Installation of IF cables and connectors for microwave antennas
Installation and troubleshooting of Eltek power system
Commissioning of Nokia Flexi hopper (M/W) PDH links.
Commissioning 2G (900 and 1800) Flexi BTS
Commissioning 3G Node B
Integration of 2G/3G Flexi BTS
Coordinates with all concerned groups to expeditiously resolve problems that are encountered in the site during equipment delivery, installation, integration and site acceptance and ensure that all client service requirement are treated with urgency and responded accordingly the soonest possible time.
Preparation of sites for PAT (Preliminary Acceptance Test)
Responsible RF cable sweep test and troubleshooting of VSWR and DTF using the Anritsu site master.
Responsible for the site acceptance.
Ensure proper grounding system installation for equipment protection.
Install battery and terminate connection to rectifier.
Project: ZAIN TELECOM 2G and 3G Roll-out
Technical Support Engineer
Pagemcom Inc.
04.2008 - 02.2009
Responsible for surveying, installing, testing, commissioning and troubleshooting of Tellabs 6325 – Edge Node Multiplexer
Responsible for troubleshooting Tellabs 6320
Responsible for leading insertion of Tellabs 6325 (STM-16) from Tellabs 6320 (STM-4) Fiber Optics Transmission System
Responsible for E1 expansion/card insertion of Tellabs 6340
Project: TELLABS-FITL, SMART TELECOM
Instructor
System Technology Institute
11.2006 - 03.2008
Taught Basic Electronics and Electricity, Computer Drawing using IntelliCAD, Analog and Digital Electronics, Fundamentals of Networking, Computer Organization, PC Technology 1 and 2.
Electromechanical Technician I
Philips Semiconductor Philippines Inc.
07.2005 - 12.2005
Responsible for failure analysis and investigations on yield detractors and provide necessary countermeasure
Responsible for analyzing and improving frequent machine problems
Service Engineer
Radar and Communication Services
11.2004 - 04.2005
Responsible for repairing, installing and commissioning of navigational equipment
Education
Bachelor of Electronics and Communications - Engineering
Technological University of the Philippines
01.2003
Skills
Proficient in Microsoft Office Suite
Results-driven under deadlines
Project scheduling expertise
Skilled in digital navigation
Knowledgeable in using VOM, BER Tester, Power Meter, Optical Attenuator and Anritsu Site Master
Knowledgeable in troubleshooting telecom wireless alarms (2G, 3G, 4G and 5G)
Huawei ICT platform expertise
Project management
Strategic project planning
Team engagement
Proficient in delegating tasks
Accomplishments
One of the engineers who pioneered the 4G (2012) and 5G (2019) implementation
Loyalty Award given by Primus @ Knowledge Specialist (2017)
Board Passer in Electronics and Communication Engineering Philippines (2003)
Timeline
Material Processing
Uniplas NZ Limited
12.2022 - Current
Project Supervisor
Mobicon Networks
05.2022 - 07.2022
Site Supervisor
Lserv Corporation assigned to Ericsson Telecommunication Inc.
01.2021 - 03.2022
Site Supervisor
Collabera Technologies Private Ltd. Inc assigned to Ericsson Telecommunication Inc.
06.2019 - 12.2020
Site Engineer
Primus @ Knowledge Specialist assigned to Huawei Technologies Philippines Inc.
04.2012 - 03.2019
RF Technician/TI Team Leader
Al Batin LeBlanc Telecommunication Systems Ltd.
03.2009 - 03.2011
Technical Support Engineer
Pagemcom Inc.
04.2008 - 02.2009
Instructor
System Technology Institute
11.2006 - 03.2008
Electromechanical Technician I
Philips Semiconductor Philippines Inc.
07.2005 - 12.2005
Service Engineer
Radar and Communication Services
11.2004 - 04.2005
Bachelor of Electronics and Communications - Engineering