Industrious Concrete Foreman with outstanding commitment to high-quality work and worker safety. Detail-oriented and adept at motivating teams with extensive knowledge of concrete fountions and blueprint interpretation. Successful at staying focused after long hours in tough conditions and creating long-lasting final results.
Overview
2
2
years of professional experience
Work History
Concrete Foundation
Solib Base Foundation Contrators
01.2022 - Current
Set wood and other forming materials to prepare for concrete pours.
Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
Maintained clean, safe worksite for team safety and to help keep projects on-track.
Demolished and repaired old concrete surfaces.
Ordered materials and scheduled cement trucks.
Installed rebar and molded expansion joints and edges for concrete projects.
Created specific finishes on poured concrete.
Adapted concrete pouring and mixing plans to daily weather and climate.
Mixed, spread, and patched concrete to specifications.
Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
Poured and laid concrete for a number of projects.
Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards.
Measured precise amounts of concrete and verified levelness to improve quality of finished product.
Routinely lifted and moved items weighing up to 3. tons .
Met with engineers to plan layouts and timeframes for jobs.
Confirmed employee time cards and handled payroll of 5-person construction team.
Shoveled materials such as dirt, gravel, and asphalt.
Installed forms for shaping, insulating, or creating decorative effects in concrete.
Measured and marked areas for deploying concrete.
Applied sealers or waterproofing to concrete as required by project.
Handled repairs on concrete finishing equipment, keeping tools operational.
Cut, chipped, or sawed concrete to create desired shapes.
Adhered to safety and reporting procedures.
Estimated materials and labor costs for concrete projects to manage project budgets.
Engaged with customers and subcontractors and provided timelines for project completion.
Reviewed all project documentation and blueprints to prioritize and schedule job tasks.
Repaired damaged items using different chemicals and tools.
Mixed cement for standard, volumetric, or pervious concrete.
Monitored inventory of key tools and materials used at each project site to provide consistent availability.
Applied contraction, construction, or isolation joints in appropriate areas and situations.
Inspected concrete structures for complete fills, defects, or damage.
Operated equipment such as forklifts safely to efficiently complete site work.
Troweled and finished concrete to create textured or decorative surfaces.
Wore correct clothing and protective equipment for jobs.