Spending time with my Children
Hunting
Fishing
Riding Dirtbikes
Dynamic Earthworks Manager with extensive experience at C&R Developments, excelling in project management and team leadership. Proven track record in overseeing large-scale civil earthworks, ensuring safety compliance, and enhancing operational efficiency. Skilled in GPS machine control and conflict resolution, driving successful project outcomes while fostering strong relationships with stakeholders.
Work History
Summary
Below is the summary of my work history at C&R Developments where I have been conducted the following roles:
· Senior Machine operator
· Site Surveyor
· Earthworks manager/Site Supervisor
· Health and Safety manager
· Large load pilot
The bulk of my work has been as a Site Supervisor or Earthworks Manager and I have worked between bulk cut to fill operations in Coal Mines and Quarries to large scale civil earthworks contracts with bulk structural fill requirements.
I have had extensive experience in the placement of structural fill in all material types that involved dealing with highly sensitive silts and clays that involve drying or application of moisture to achieve stringent testing targets.
I have also had extensive experience in reading geotechnical plans and horizontal development plans and can interpret long sections and cross sections from paper to screen to the ground.
In my time at C&R Developments I have come develop an in-depth knowledge of Topcon 3D GPS machine control from systems of inception generation to the latest on the market and have also learnt how to troubleshoot most issues and how to apply updates and fix componentry.
I can position check machine accuracies and adjust to suit through machine builds.
I have an extended knowledge of how to use Topcon GPS rovers of multiple generations for set out and survey and also to set up base stations for machine control. I can perform localisations and understand datums and geoids and can use these to apply to plans that specify these parameters.
I have 2 years of experience in applying ground control from GPS rover and flying DJI survey drones for large and small scale survey to be processed for claim and proof of accuracy.
Machine experience
In my time at C&R I have operated the following plant:
Excavators with and without machine control some with auto dig and tilt bucket or other attachments. Longreach experienced.
Komatsu excavators vary from dash 1 through to dash 11
· PC130
· PC200
· PC210
· PC300
· PC360
· PC450
· PC600
· PC850
· PC1000
· PC1100
· PC1250
· PC1800
Caterpillar excavators vary from A series through to Next Gen
· 320
· 323
· 325
· 326
· 352
· 385
· 390
· 5130
Hitachi excavators from dash 5 to dash 7
· EX120
· ZX135
· ZX290
· ZX800
Volvo excavators vary through B series to E series
· EC250
· EC480
· EC700
Liebherr excavators vary B to C series
· 984C
· 994B
Dozers with and without machine control, some on auto blade.
Caterpillar dozers vary from K series (old k series) through to Next Gen.
· D4
· D6
· D7
· D8
· D9
· D10
· D11
Komatsu dozers from dash 5 through to dash 11
· D37
· D39
· D61
· D65
· D85
· D155
· D375
· WD600
Liebherr dozers
· PR754
Loaders with and without load scales
Caterpillar Loaders vary from D to M series
· 972
· 980
· 992
Komatsu loaders vary from dash 5 to dash 7
· WA600
· WA800
· WA900
Haul trucks
Caterpillar trucks vary from B series to Next Gen
· D300
· 730
· 740
· 769
· 777
Komatsu trucks vary from dash 2 to dash 7
· HM300
· HM400
· HD605
· HD785
Volvo trucks F and H series
· A40
· A60
Graders Some with machine and some without, experience in autoblade machines also.
Caterpillar graders from H to Next Gen
· 12H
· 140G
· 140H
· 14M
· 16H
· 16M
· 24H
I have also operated multiple types of compaction machines and other ancillary plant such as fuel carts and watercarts.
I have extensive experience in water pump set up, use and trouble shooting from deep well dewatering, wellpointing and pumping bulk water through injection and metering systems.
Highly experienced on heavy haul Kenworth roadtrucks with transporting plant and tipper bodies.
Contracts I have managed
K2 contract
August 2019 - January 2020.
Supervision of contract Bulk cut to dump operations in BT mining K2 Coal mine, Waikato.
· PC1250 and PC850 loading KomatsuHD785s and Cat 777s to Cat D8 dozers 9000M3 per shift.
Hunua civil contract
January 2020 - March 2020.
· Building large chimney drain systems and overseeing installation of sump pump in Hunua pit backfill at Hunua quarry, Auckland.
· Operation of PC300 on 3D GPS and Cat D9 and D11.
Northview subdivision
March 2020 - June 2020.
· Managing structural fill operation in a large residential subdivision, placing highly sensitive orange clays and volcanic ash, all fill required drying and water application to compact to extremely tight parameters.
· Into the winter months, Lime stabilisation was required.
Rotowaro shift contract
June 2020 - September 2020.
Shift supervisor at Bathurst Rotowarocoal mine, Waikato.
· Overseeing Bulk cut to fill operations.
· PC1800, PC 1250, Liebherr994 loading KomatsuHD 785 haul trucks carting to Cat D10 dozers.
· Cat 16M and 24H graders for haul road maintenance.
Horotiu inland port preload
September 2020. Placement of Structural fill and preloadover a large gully for new public road alignment.
Ruakura superhub inland port
September 2020 - August 2022.
Surveyor and health and safety manager at Ruakura inland port development, Waikato.
Excavators: Komatsu PC1250 x2, Hitachi ZX800, Volvo EC480/EC250, Komatsu PC200, Komatsu PC360, Komatsu PC450, Cat 323F, Cat 326F, Cat 352 next gen, Komatsu PC130.
Dozers: Cat D6T x3, Cat D8T x2, Cat D9N x2, Cat D10R, Liebherr PR 754, Komatsu D61pxi, Komatsu D65pxi.
Loaders: Komatsu WA600 – 3, Cat 980H
Haul trucks: Komatsu HD605 – 7 x3, Komatsu HD785 – 5 x2, Komatsu HD785 – 7 x3, Komatsu HM400 x 8, Komatsu HM300 x4, Cat D300, Volvo A60H x3
Watercarts: Cat 769c, Volvo A40F
· Surveying all cut and structural fill operations.
· Formation of large wetlands 3 metres below the mean water table.
· Management of all 3D GPS machines onsite to +/- 50mm tolerance.
· All end of month surveys with Topcon GPS rover and DJI survey drone and collation of survey volumes to contract requirements.
· Weekly production reports.
· Winter works reporting to regional council representative.
· Training of new staff on all plant.
· Organising geotechnical testing on a daily basis.
· Placing of various types of geotextiles for slope stabilisation and fill strength.
· Enforcing quality control across the site for GPS tolerances and visual aspect of work completed.
· Placement and survey of settlement pins in preloads.
· Keeping site on track with all health and safety procedures and processes.
· Writing and checking JSAs and TAKE5s.
· Signing off staff on various pieces of plant as per requirements.
· Developing PHMPs and PCPs for sites.
· Leading toolbox meetings.
· Management of onsite water from deep cut drainage crews.
· Pumping and dosing of water with Flocculant to reduce turbidity.
· Discharge of polished water into live streams and documenting all movements and volumes.
· Extensive pH study of iron laden water to wetlands for discharge, the water was too low in pH and couldn’t be discharged.
· Dosing of water with hydrated lime to raise pH and polish.
Ruakura superhub inland port
August 2022 – November 2024
Supervisor of Ruakura Superhub inland port development, Waikato.
Excavators: Komatsu PC1250, Hitachi ZX800, Volvo EC250, Komatsu PC200, Komatsu PC450, Cat 326F, Cat 352 next gen, Komatsu PC130.
Dozers: Cat D6T, Cat D8TKomatsu D61pxi, Komatsu D65pxi.
Loaders: Komatsu WA600 – 3, Cat 980H
Haul trucks: Komatsu HM400 x4, Komatsu HM300 x2, Cat D300, Bell D50 x2, International Payhauler 350c x2
Motorscrapers: Cat 627H, Cat 627K
Watercarts: Volvo A40F
Daily supervision of the entire site entailing the following:
· Manging crews of up to 25 Staff on various plant groups undertaking highly sensitive and high risk tasks.
· Running PSI and Toolbox meetings.
· Writing JSAs and management plans.
· Dewatering large cut areas to clean water diversions.
· Live stream diversion plan development to council and execution of plans to divert streams and fish species.
· Wetland development and livening wetlands and streams.
· Developing winter works plans to council satisfaction.
· Monitoring site during and post weather events.
· Placement of highly sensitive structural fill deriving of alluvial silts that required drying pre compaction.
· Compaction of highly sensitive alluvial silts to engineer specification.
· Dam construction during winter period, undercut 2 metres below water table, dewater and build in layers from alluvial sands with geo grid placement every 300mm.
· Preload removal and building to specified heights in challenging winter conditions with no haul roads or competent materials.
· Swale formations to direct overland water to wetlands.
· Slope stabilisation on large batters.
· Pad stabilisation and close out to council requirements.
· Site preparation for large industrial buildings.
· Subgrade construction and placement of materials for roading.
· Working around High voltage transmission lines, constructing stand off zones and protection barriers.
· Formation of large wetlands 3 metres below the mean water table.
· Management of all 3D GPS machines onsite to +/- 50mm tolerance.
· All end of month surveys with Topcon GPS rover and DJI survey drone and collation of survey volumes to contract requirements.
· Weekly production reports.
· Winter works reporting to regional council representative.
· Training of new staff on all plant.
· Organising geotechnical testing on a daily basis.
· Placing of various types of geotextiles for slope stabilisation and fill strength.
· Enforcing quality control across the site for GPS tolerances and visual aspect of work completed.
· Placement and survey of settlement pins in preloads.
· Keeping site on track with all health and safety procedures and processes.
· Remediating staff conflict and disagreements to achieve a satisfactory outcome.
· Managing mechanics and their tasks to run an efficient operation.
· Managing servicing requirements of all plant and ensure service technician keeps all plant in operational state.
K3 Coal mine Ash stockpile capping
November 2025 – February 2025
Supervisor Capping a coal flyash stockpile to extremely high permeability standards for closeout of Fonterra consent conditions.
Excavators: Cat 326F, Komatsu PC200
Dozers: Cat D6T
Haul Trucks: Komatsu HM300-3 x2
Ancillary: Tractor and discs Case 305 Magnum, Cat CS56 compactor, Volvo A40F watercart.
· Developing all site documentation for contract execution. Such as: TMPs, HSMPs, compaction standard plans and 3D designs.
· Case study of available materials to ensure the feasibility of use in the required application.
· Liaising with landowners to develop plans to use farmland for haul roads and borrow pits.
· Prepping stockpile for capping, shape ash and compact.
· Develop haul roads from cut to stockpile.
· Haul Fireclay to stockpile at 11% moisture, place in 100mm layers to screen out oversize siderite rock, condition with discs, apply moisture to 35% and compact to standard.
· Dewater perched watertable in stockpile to primary ponds as Boron is present in flyash.
· Build capping and pull batters to fill as required.
· Change to yellow clays when Fireclay resources were exhausted.
· Change methodology to place and compact yellow clays with constant conditioning and moisture application or drying.
· Test every 300M3 placement of material with NDM and Shearvane.
· Take core samples for permeability testing.
· Shape stockpile capping to 3D GPS tolerances of +/- 50MM.
· Topsoil stockpile capping to 300MM depth and seed to stabilise.
· Close out site and reinstate fencing and pasture.
· Clean all gear for transport and load on transporters for another site.
Gleesons Quarry stripping contract
February 2025 – present
Supervisor Stripping of Quarry overburden to structural fill buttress bunds and construction of certified clean fill tip head. Cut area perched on northern side of pit with extremely tight work areas for trucks to move and no Quarry infrastructure to start off.
Excavators: Cat 352 next gen, Komatsu PC200
Dozers: Cat D6T, Cat D9L, Cat D7H, Liebherr PR754
Haul Trucks: Komatsu HM400-3 x2
Motorscrapers: Cat 627H, Cat 627K
Compactors: Cat CS56, Cat 815F, Cat 825F
· Developing all site documentation for contract execution. Such as: TMPs, HSMPs, compaction standard plans and 3D designs.
· Liaising with Quarry management to develop cut to fill planning and expectations of contractor standards.
· Set up and placement of all site amenities.
· Receiving plant to site from transport crew.
· Opening up and forming of all Haul roads throughout work area from cut to fill.
· Placement of varying fill materials (yellow and white clays and Fireclay with rider coal seams) to 3D GPS design, NDM and Shearvane testing every 500MM lift.
· Construction of Basal drains to SRP ponds and drainage blankets throughout fill in various vertical increments.
· Digging of Shearkeys and placement of drainage material and Novaflo pipes.
· Cutting batters and benches in a typical Quarry fashion to 3D design and paying close attention to geotechnical changes and the large fault line the splits the cut in half.
This fault encases a large number of thin coal seams of Kupa Kupa origin, which can hold water. Drainage of these water sources must be done so the water cannot flood the cut floor to hinder haul truck movements.
· Placement of Quarry aggregates to build new cleanfill tiphead for road truck and trailers.
· Placing of various types of geotextiles for slope stabilisation and fill strength.
· Enforcing quality control across the site for GPS tolerances and visual aspect of work completed.
· Keeping site on track with all health and safety procedures and processes.
· Remediating staff conflict and disagreements to achieve a satisfactory outcome.
· Managing mechanics and their tasks to run an efficient operation.
· Managing servicing requirements of all plant and ensure service technician keeps all plant in operational state.
Final overview
Summary
At my time a Gavins NZ I started as a senior operator and quickly moved up to earthworks foreman.
The bulk of my work involved civil and agricultural earthworks and drainage projects.
Significant projects
Prep and backfill of Birchwood lane culvert on Waikato expressway.
This project involved the stripping of live stream bed and shaping to 3D design and building of crane pads for a 200 tonne crane.
The steel sectional culvert consisting of an 88 metre long and 5 metre pipe was imported from Canada and constructed onsite by construction contractors.
I supervised the prep and backfill of the pipe to design, this involved layering the rock backfill evenly on either side and shooting the sides of the pipe with a total station to ensure that no warping was taking place. NDM and clegg hammer testing was conducted every 200mm lift.
On either side of the pipe we had to work around indigenous native pa sites and large Kauri trees that had native bats living in them so noise and disturbance had to be kept as low as possible.
Largest stock underpass installation in New Zealand.
In early 2016 I supervised the installation of the largest stock underpass in New Zealand at that current time with 11 precast concrete sections that were 3.7 metres high and 5.4 metres wide.
Timeframes were extremely tight with the road closure only being 5 days long from 4am Monday to 6pm Friday.
This was installed under a public road in an opencut fashion, the crew had to work around the main copper communication line through New Zealand and the back up communication line also.
The road was ripped off and sidecast, with the cables carefully dug up and suspended above the work area. The main cut was then excavated to subgrade level and a blind of PAP product placed to laser precision.
A 200 tonne crane pad was constructed for the crane to place the 14 tonne sections in ground and these were tied together with Reid bar. All sections were placed in 18 hours.
The headwalls were installed and backfill commenced with mortar being poured into hollow galleries. The aprons were prepped and had concrete poured immediately. Backfill testing was conducted with every 200mm lift to NZ transit requirements all the way to road subgrade level.
The subgrade was prepped for chipseal and this was laid at 2pm on the Friday.
The underpass installation was executed within timeframes to manufacturers and engineers specifications with no lost time incidents or hold ups.
The road was reopened at 5 pm on the Friday an hour ahead of schedule.
I also undertook various other earthworks projects throughout my time at Gavins such as:
· Dam and effluent pond construction.
· Tree felling and Forestry/Logging.
· Health and safety management and planning.
· Drainage and pipe installation.
· Swimming pool installation.
· Crane pad construction.
· Bridge abutment construction on Waikato expressway.
· Road grading and construction.
· Large industrial building site preparation.
· Road truck and trailer operation.
· Combine harvester and forage harvester operation.
· Tractor and scoop operation on autograde 3D GPS.
· Workshop duties such as welding and engineering.
· Peat flat drainage.
· Council drain cleaning on public roads.
Machines operated whilst at Gavins NZ.
Excavators
· Volvo EC140D
· Volvo EC145C
· Volvo EC210C
· Cat 312D
Dozers
· Cat D4H
· Cat D6K
· Komatsu D51Pxi
Tractors
· John Deere rigid frame wheel tractors 400hp with Ashland GPS scoops.
Harvesters
· John Deere s690 combine harvester.
· Claas 960 Forage harvesters.
Summary
At my time with J&H Contractors, I was their senior operator. I mostly undertook Residential and Agricultural earthworks around the north Auckland/Kaipara region.
I learnt a lot here from a highly experienced owner of the company that helped me prove my worth and move onto the highly skilled Manager that I am today.
Daily tasks included:
· Cutting house sites to design with bulk cut to fill requirements.
· Quarry developments for Winstone aggregates sand plant and Greywacke Quarry.
· Agricultural drainage and maintenance of farm tracks.
· Farm development.
· Small subdivision roading and drainage projects.
· Metal and aggregate cartage.
· Machine transport and heavy haul.
· Hay and silage making from Grass and Maize.
· Laser trenching and pipe installation.
· Workshop duties such as engineering, welding and servicing.
· Forestry/Logging roading and Tree harvesting.
· Dam and Effluent Pond construction.
· Slip remediation.
· Floodgate design and Construction.
· Large industrial building preparation.
Machines operated at J&H Contractors
Excavators
· Kobelco SK120-2
· Kobelco SK135-3
· Kobelco SK135-5
· Hiatchi Zaxis 210
Dozers
· Cat D4H
Other plant
· Wheel Tractor and scoop.
· Tipper Truck and Trailer.
· Truck and Transporter.
· Vermeer self-propelled trencher.
· Claas 840 Forage Harvester.
· Wheel Tractor and Silage trailer.
A grade Quarry Manager
B Grade Quarry Manager
Level 4 Surveyor
Level 5 Civil Project Manager
Spending time with my Children
Hunting
Fishing
Riding Dirtbikes