With a robust background in engineering and supervision, notably at Brightwater Engineering, I excel in stainless steel fabrication and leading teams to success. My expertise spans from pipe welding to implementing comprehensive health and safety protocols, ensuring project excellence and efficiency. My leadership and technical skills drive project completion beyond expectations, reflecting my commitment to quality and safety.

Overview

25
25
years of professional experience

Work History

Site Supervisor

Brightwater Engineering
08.2019 - Current

Job Manager

IMG
10.2017 - 08.2019

Site Supervisor

Tubman Heating Ltd
05.2016 - 10.2017

Site Supervisor

FILTEC
01.2013 - 01.2016

Workshop Supervisor

Parfoot Engineering
01.2012 - 01.2013

Leading Hand

Active Welding
01.2012 - 12.2012

Site Supervisor

Sabre Engineering
01.2011 - 12.2012

Turbine Fitter/ Installer

Remi Engineering (Aus)
01.2010 - 12.2011

Fabricator/Fitter

Genis Steel (Australia)
01.2010 - 12.2010

Supervisor

Service Engineers
01.2008 - 12.2009

Supervisor

Egmont Engineering
01.2008 - 12.2008

Fitter/Welder

McConnell Dowell
01.2008 - 12.2008

Fitter/Welder

Page MaCrae
01.2007 - 12.2008

Fitter/Welder

WFM Engineering
01.2007 - 12.2007

Fitter/Welder

GEA Engineering
01.2007 - 12.2007

Fitter/Welder

Steiner Moses
01.2007 - 12.2007

Fitter/Welder

Century – Wairakei
01.2006 - 12.2007

Fitter/Welder Apprenticeship

Page MacRae
01.2001 - 12.2006

Apprenticeship commenced

Trimax Mowers
01.2000 - 12.2001

Education

Fitter/Welder -

Page Macrae
Mount Maunganui
01.2004

Basic Engineering -

Taranaki Polytech

ASME IX weld ticket - 6G Position

Skills

  • Experienced supervisor
  • Broad health and safety knowledge
  • Reading of drawings
  • Stainless steel fabrication
  • Pipe welding and fitting
  • Fabrication

References

Available on request

Relevantprojectexamples

  • Brightwater, 01/01/21 - 12/31/23, Daifuku, Supervisor, $5 million, Installation of new package & handling facility
  • Brightwater, 06/01/19 - 12/31/21, Water Care, Supervisor, $300K, Daf tank upgrade, MLE upgrade a clarifier upgrade
  • IMG, 01/01/19, WOSL, Job Manager, $300K, Installation of jet fuel filters and associated pipework.
  • IMG, 12/01/18 - 12/31/19, James Hardie, Job Manager, $400K, Replacement of cradles supporting pressure vessels. Managing a team of fifteen.
  • IMG, 10/01/18 - 12/31/18, BOC, Site Supervisor, $400K, Supervision of team of five to install the 300-bar gas bottle filling stations.
  • Tubman Heating Limited, 05/01/17 - Present, Tubman Heating Limited, Site Supervisor, $1 million, Commercial boiler installation and maintenance across various sites in Auckland. Involved managing a small team and liaising with clients.
  • Litchfield Drier Upgrade (FILTEC), 01/01/16, Fonterra, Site Supervisor, $1.6 million, Demineralisation water treatment facility for boiler and drier.
  • Eltham Water Treatment Plant (FILTEC), 01/01/16, Stratford District Council, Site Manager, Undisclosed, Ground up refurbishment of water treatment plant to commissioning process.
  • Nelson Water Treatment Plant Membrane Upgrade (FILTEC), 01/01/15, Fulton Hogan, Site Supervisor, $480,000, Fabrication and installation of stainless pipework, including valve and equipment to match the other existing Membrane system.
  • Timaru – Glenavy (FILTEC), 01/01/14, Oceania Diary, Site Supervisor, $2.4 million, Responsible for supervision and management of 2-5 Contractors.
  • Dargaville Water Treatment Plant (FILTEC), 01/01/14, Kaipara DC, Site Supervisor & Commissioning Engineer, $500,000, Supervision and management of 2-5 Contractors.
  • Fire Training Facility (American Samoa), 03/01/08 - 05/01/08, McConnel Dowell, Supervisor, Undisclosed, Installation of Mechanical Fit out for the Fire Training Facility (Air Force Base).
  • Lichfield Dairy Factory, 05/01/07 - 08/01/07, GEA Engineering, Fitter and Welder, Undisclosed, Fabrication of the mechanical fit out for the Litchfield Dairy Factory.
  • Mokai Geothermal Power Station, 01/01/07 - 04/01/07, Steiner Moses, Fitter and Welder, Undisclosed, Fabrication of the mechanical fit out for the Mokai Geothermal Power Station.

Timeline

Site Supervisor

Brightwater Engineering
08.2019 - Current

Job Manager

IMG
10.2017 - 08.2019

Site Supervisor

Tubman Heating Ltd
05.2016 - 10.2017

Site Supervisor

FILTEC
01.2013 - 01.2016

Workshop Supervisor

Parfoot Engineering
01.2012 - 01.2013

Leading Hand

Active Welding
01.2012 - 12.2012

Site Supervisor

Sabre Engineering
01.2011 - 12.2012

Turbine Fitter/ Installer

Remi Engineering (Aus)
01.2010 - 12.2011

Fabricator/Fitter

Genis Steel (Australia)
01.2010 - 12.2010

Supervisor

Service Engineers
01.2008 - 12.2009

Supervisor

Egmont Engineering
01.2008 - 12.2008

Fitter/Welder

McConnell Dowell
01.2008 - 12.2008

Fitter/Welder

Page MaCrae
01.2007 - 12.2008

Fitter/Welder

WFM Engineering
01.2007 - 12.2007

Fitter/Welder

GEA Engineering
01.2007 - 12.2007

Fitter/Welder

Steiner Moses
01.2007 - 12.2007

Fitter/Welder

Century – Wairakei
01.2006 - 12.2007

Fitter/Welder Apprenticeship

Page MacRae
01.2001 - 12.2006

Apprenticeship commenced

Trimax Mowers
01.2000 - 12.2001

Fitter/Welder -

Page Macrae

Basic Engineering -

Taranaki Polytech

ASME IX weld ticket - 6G Position

Jason Deller