Summary
Overview
Work History
Education
Skills
Websites
Certification
Timeline
Training
Disclaimer
Generic
Jessie ramirez

Jessie ramirez

Tauranga,New Zealand

Summary

To be associated with a company and obtain a position that would best fit my qualification and develop further my talent and skills for continuous career improvement and to be a part of a work force that will give way to professional and personal growth.

Overview

26
26
years of professional experience
1
1
Certification

Work History

Foreman

ABC PIPEFITTER
Otahuhu
04.2019 - Current
  • Pipe fitter / pipe welder
  • Project: Commercial Building And Hospital
  • Heavy Equipment or Tools and Equipment handled: - victaulic machine - hydraulic Manual test pump - pipe bender - ppr iron - tig welding machine - pipe crimping machine tools - drop saw - threading machine - stick welding machine - gas set welding - skilledsaw - ewp (scissor lift )
  • Job Descriptions: - capable of directing staff in the lesser task required of them and handling their on-site daily management - conduct weekly toolbox meetings to be with the on-site team - ensure staff sign in daily, correct job activity - regular quality assurance checks on the work being carried out by the team
  • Material Management: - oversee deliveries on site, ensuring all the items delivered - ordering of materials ahead of time of the work start plan date
  • Equipment and site management: - maintain the company’s site folder via Microsoft Teams - responsible for all company’s tools and equipment used on site - check to ensure that electrical equipment is tagged and safe to use - keep track of site box, site tools and PPE required for the project. All such items to be returned to the workshop and accounted for on completion of the project - complete bi-monthly checklist for company vehicle, e.g. let the office know when the vehicle requires road user changes to be purchased
  • Health and Safety: - ensure all health and safety procedures are adhered to, undertaking regular on-site checks of safe behaviours - keep records of all health and safety incidents, ensure that they are reported to the H & S Office and a record is maintained in the site folder via Microsoft Teams
  • Communication and QA: - ensure that Project Manager are informed when materials are required on site so that work can continue uninterrupted - effective communication with the team, Project Manager and office staff
  • KNOWLEDGEABLE AND SKILLED ON
  • starting for making a plan following the drawing
  • prefab pipe bracket hanger and installed in according to drawing
  • Read and interpreted blueprints, diagrams, sketches and other technical drawings to determine best installation methods.
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.
  • fabricate pipe and assemble sections according to specifications
  • lay out pipe route ( fan coil units to ring main to riser to air handling unit plant room to chiller or boiler )
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Demonstrated versatility in skillset by working with various types of pipes such as PVC pipe, ppr pipe, copper pipe, steel pipe, stainless steel pipe, and medical gas pipe
  • installation of pipe ( copper pipe, carbon steel pipe, stainless pipe, stainless tube , ppr pipe, med gas pipe, pvc pipe for condensate drain
  • knowledgeable on aligning motor pumps for heating line and chilled line in the plant room
  • knowledgeable on aligning chiller and ahu ,buffer tanks, expansion tank and dosing pot
  • installation of piping systems, ensuring compliance with safety standards and project specifications.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Insolation process: - pipe and valves insulation using thermobreak , fibre ,armaflex - Aluminium cladding for pipe and valves
  • knowledgeable of using victaulic gooving machine, threading machine, manual threading, crimping press machine, PPR fusion machine,
  • cutting pipe using automatic cutting machine, manual cutting using grinder, and oxy acetylene torch
  • Installed new systems and connected piping to existing components by welding, copper brazing, ppr fusion, crimping, victaulic connection, bolting and threading.
  • Inspected and tested existing pipe systems to identify system defects and malfunctions.
  • troubleshoot, diagnose and repair mechanical issues
  • testing the pipeline using hydro test and pneumatic test to find leaks and defective materials
  • Jointing process: ( KNOWLEDGEABLE AND SKILLED ON ) - gas welding / copper brazing for copper pipe ( with purging for med gas pipe )
  • tig welding , manual welding and flux cord welding for steel pipe and stainless pipe ( with purging for stainless pipe )
  • tig welding for stainless tube ( with purging )
  • plastic welding or PPR Fusion
  • victaulic machine for victaulic joints ( make sure the fittings was clean and with grease inside )
  • threading machine and manual threading for threaded pipe connection
  • crimping machine for crimping pipe

Pipe Fitter / Pipe welder

Axis Plumbing Nz Pty Ltd
Auckland, New Zealand
12.2018 - 04.2019
  • Building construction in Auckland
  • Pipe fitter, pipe welder
  • Project: Hotel and Convention

Fitter and Welder

Shikoku Marine Tech Co., Inc.
Japan
02.2015 - 02.2018
  • Metal construction for ship vessels
  • 3 yrs experience as a fitter and welder
  • Project: Metal Construction for ship vessels
  • Heavy equipment or Tools and Equipment handled: - moving crane 3 to 5 tons - vernier caliper - protractor - bending machine - micro meter - center puncher - puncher machine - divider - hammer - drill press - angle finder - universal machine - electric cutter - welding machine - gouging machine - bevel machine - torch - semi-automatic cutting torch - grinder - hydraulic pipe tester - compressor - fabricated jigs - level bar - clamps - compass
  • Job description: - knowledgeable in applying safety practices - ability to interpret drawing and sketches - can perform industry calculation - ability to contribute quality system - responsible to fabricate any pipe lines such as carbon steel, stainless steel , and black iron according to plans - responsible to fabricate any kind of dobber according to plans - responsible for plate and pipe fitting - responsible to fabricate special flange when needed - responsible to weld plate and pipe using semi-automatic welding such as FCAW, GMAW, and TIG - responsible for measuring, cut and fitting of pipes - skilled in lay out - responsible to apply hydraulic test in pipe - knowledgeable in using hand tools and power tools

Welder/ Fitter

RG Placement Services Incorporated
Navotas, Philippines
08.2013 - 07.2014
  • Shipyard
  • 10 months of experience as a welder and fitter
  • Tools and Equipment handled: - chain block - chipping hammer - hammer - cutting torch - steel brush
  • Job description: - full welder from 1G to 6G. 1F to 4F using (SMAW) - familiar with ship vessels repair - set up equipment and weld parts - repair and modified ship equipment according to job order - followed all safety guidelines, including proper machine handling procedure - perform plate and pipe fitting if necessary - combined welding techniques , knowledge in metallurgy and engineering requirements to produce quality works - skilled in repairing broken parts of machines and any part of ship vessel - can work in night shift duty and also week ends and holiday

Mechanical Fitter and Pipe Welder

Al Mansouryah
Al Qassim, Buradiah, Kingdom of Saudi Arabia
11.2011 - 05.2013
  • Building establishment particularly University
  • 1 yr and 6 months experience as a mechanical fitter and pipe welder
  • Project: Qassim University
  • Tools and Equipment Handled: - chain block - grinder - chipping hammer - clamps - compressor - cutting torch - steel brush - level bar
  • Job description: - ability to interpret drawing and plan or blueprints - responsible for pipe line fittings - responsible in pipe line assembly from pump room to main line and to AHU connections - skilled in pipe fitting with less supervisions - perform pipe welding using SMAW process - remove excess materials after completing a weld - flexibility when there is a change in the plan - accuracy in pipe fitting and pipe welding

Fitter / Welder

RLT SHIPYARD , BONANSA SHIPYARD, JOSEFA SHIPYARD, FRABELLE SHIPYARD
Philippines
04.2003 - 10.2011
  • Marine works , Shipyard
  • 8 yrs experience
  • Project: Shipyard
  • Tools and Equipment: - welding machine - cutting torch - chain blocks - crane - hydraulic machines
  • Job Descriptions: - responsible in ship repairs - responsible to replace all of the pipe lines of the ship vessels - repair some machinery if needed - rebuild the ship from scratch to new ones - re upgrade the ship - perform stick welding in all position - perform copper brazing - build a new shipping vessel from start to finished - rebuild the platform of the main engine of the ship - doing all of the minor and major parts of the ship from replating and pipe works

Plumber

ERNESTO RAMIREZ
Philippines
01.2000 - 01.2003
  • Residential Plumbing Works
  • 3 years experience
  • Tools and Equipment: - pvc cutter - silicon gun - drill - level bar - hole cutter
  • Job Descriptions: - installation of pipe lines in the house - installation of pipe lines for drinking lines - installations of pipe lines in the kitchen sink, shower, toilet , bath room , laundry area - installation of toilet bowl - installation of faucets and shower - doing pipe lines from main line up to house area - installation of pipe line up to sewage tank - installation of pipe line for the drainage of roofing

Education

Vocational - SMAW NCII

Center for Applied and Practical Skills Inc.
Espanya Sampaloc, Manila
10.2009

Secondary - undefined

Navotas National High School
01.2000

Primary - undefined

Navotas Elementary School
01.1996

Skills

  • PipeFitting
  • Fabricating
  • Welding TIG, FCAW, GMAW, MIG, SMAW, Gas welding and Brazing
  • Cutting Manual and semi-automatic (oxy-acetylene and gas)
  • Plastic welding
  • Plumbing

Certification

  • NC I ( SMAW ) and NC II (SMAW) holder
  • EWP
  • PPR

Timeline

Foreman

ABC PIPEFITTER
04.2019 - Current

Pipe Fitter / Pipe welder

Axis Plumbing Nz Pty Ltd
12.2018 - 04.2019

Fitter and Welder

Shikoku Marine Tech Co., Inc.
02.2015 - 02.2018

Welder/ Fitter

RG Placement Services Incorporated
08.2013 - 07.2014

Mechanical Fitter and Pipe Welder

Al Mansouryah
11.2011 - 05.2013

Fitter / Welder

RLT SHIPYARD , BONANSA SHIPYARD, JOSEFA SHIPYARD, FRABELLE SHIPYARD
04.2003 - 10.2011

Plumber

ERNESTO RAMIREZ
01.2000 - 01.2003

Secondary - undefined

Navotas National High School

Primary - undefined

Navotas Elementary School

Vocational - SMAW NCII

Center for Applied and Practical Skills Inc.

Training

Crane Operation (Moving) St Japan March 03, 2016

Disclaimer

I hereby certify that the above information are true and correct to the best of my knowledge and belief. Hereby bind myself to any misleading and I fully acknowledge its legal implication.
Jessie ramirez