I am an excellent team player with great electrical experience and the ability to work under pressure
Overview
7
7
years of professional experience
Work History
Electrician
Singer Electrical
09.2024 - 12.2024
Installing Taper off Boxes, Running of Cables’ Terminating and Testing of Cables
Electrician
JLE Electrical
02.2024 - 09.2024
Terminating 240mm Screened Cables, for Variable Speed Drives, and control cables
Ref
Rajnesh.Chand.66@gmail.com
Electrician
Tech Trade Agency
08.2023 - 02.2024
Maintenance on the N.Z naval fleet
Testing of Motors, and Battery Banks
Electrician
Wayne Baxter Electrical
05.2023 - 08.2023
Installing lights and running of Power cables in The Central Rail Linc Tunnels, in Auckland
Electrician
Dave Sharp Electrical
02.2023 - 05.2023
Installing basket tray, running of mains & control cables, and terminating Conveyor control Panels
Electrician
Wells Electrical
06.2022 - 02.2023
Construction of New Power station
Ladder and cable trays, Running of Power and Control cables and Terminations and testing
Electrician
Westlake Recruitment Agency
03.2022 - 06.2022
High Voltage stand over for Cable Reticulation new works at Auckland Airport, 220 Kv Transformer upgrade, at Otahuhu HV substation running of, HV Cables and terminating control cables in Panels
Contract work at Glenbrook Steel factory
Electrician
Tuia Hydroelectric Power Station
01.2022 - 03.2022
Generator upgrade, Running of Power, and control cables, terminating of control cables, in new Excitation Panel, Neutral Earth Transformer Panel, Earthing and point to point Testing
Electrician
JLE Electrical
01.2021 - 12.2021
Wiring up of Control Panels, MCC terminating of panels, terminating Instrumentation control gauges, Dalí Lighting and Power points terminating, Testing and commissioning
Ref
Riaaz
0273551104
Electrician
Global Power
11.2019 - 03.2020
Company Overview: Eneabba Terminal F.I.F.O
Wiring up of a 320Kv Substation, running of cables, Terminating of CT’s, VT’s, Field Cubicles, and Relay room panels, Point to Point Testing
Eneabba Terminal F.I.F.O
Electrician
Downer
07.2019 - 11.2019
Power cables & Antenna loop cables, Power Boxes below road level, Termination, and commissioning
Electrician
UGL
01.2018 - 01.2019
Substation Upgrades, Cable Trays, running of cables, wiring of Underground train stations Lighting and Power, Terminating and Testing and commissioning of Electrical Panels