Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jollysis Icban

11 Archers Road, Hillcrest,AUK

Summary

Diligent professional talented at cutting, punching and threading sheet metal for automotive, construction and production needs. Service-minded individual efficiently modifies, maintains and repairs equipment. In-depth knowledge of equipment structures and job-related materials.

Dependable professional with strong background installing, maintaining, and repairing systems and components. Maintains equipment safety and performance with in-depth inspections and corrections. Dedicated to quality and always professional.

Overview

27
27
years of professional experience

Work History

Aluminum Installer

Symonite Panels Limited
72 Ellice Road, Glenfield, Auckland
03.2019 - Current
  • Ensuring installations of every ACP project is completed in a professional, competent manner, leaving all customers satisfied with the quality and service.
  • Maintaining good relationships with each site manager/customer and ensuring the work area is left clean and tidy after installation is complete.
  • Communicated effectively with supervisors about progress on assigned jobs.
  • Verified accuracy of measurements and alignment of structures prior to installation.
  • Conducted routine maintenance on tools and equipment used in the installation process.
  • Adhered to all safety protocols while performing work tasks.

Foreman

Aluminum Gulf Ray
Doha, Qatar
02.2010 - 10.2017

INSTALLATION OF CURTAIN WALLS

  • The site supervisor checks the existing cradles. These should enable the technicians and supervisor to reach all required areas of the unit, and should be safe and well install we marked bracket position on the concrete slabs or structures and install the brackets or the vertical mullions and all bracket anchors and expansion joints are by engineer to emphasized appropriate selection of the item the vertical mullions are installed sequentially according to the position and installation instruction now the site project supervisor checks the vertical and horizontal alignment then the transom bars are installed position all the gasket membranes are then installed over the mullions and transom.

INSTALLATION OF WINDOWS AND DOORS

  • Before installing specific items their structural openings are cleaned from sand dust and bulky materials that might prevent good sealant to plaster adhesion. Wood wedge are placed backing are placed around the perimeter of the frame.
  • Stainless steel screws are fastened into their plugs while adjusting the position of the frame to the vertical and aligned, and the uniform tolerance around its perimeter against the surrounding plaster is thoroughly cleaned with a damp sponge. Sealant is injected into the external and internal perimeter of the frame, and 24 hours are allotted for the sealant to dry and stiffen.
  • After drying, the sealant, hinged vents are installed on their pins, and necessary adjustment of hinges is handled and locked executed to ensure perfect closure between the frames and vent, making the window or door airtight and weatherproof.

PROJECTS HANDLED UNDER AGR:

ABRAJ QUARTIER AQ 02: The Pearl Qatar (2013-2017)

Main Contractor: REDCO-AL MANA

Q-TEL OFFICE BUILDING: ABU HAMOUR (2012-2013)

Main Contractor: AMANA

AL WAJBA OFFICE BUILDING: AL WAJBA (2011-2012)

Site Foreman

Aluminum & Light Industries Co. Ltd. ALICO
Sharjah, UAE
08.2002 - 12.2009
  • Ensured that jobsite materials were properly stored and handled in accordance with industry best practices.
  • Collaborated with other supervisors and managers to coordinate activities between different trades or departments.
  • Reviewed plans prior to commencement of construction works; proposed modifications where necessary based on field conditions.
  • Inspected completed projects for quality assurance and adherence to safety standards.

Carpenter and Finishing

Way Long Construction
R O C, Taiwan
05.1997 - 10.2000
  • Assigned in the carpentry finishing works, such as making cabinets, ceiling dividers, and doors.
  • Taking charge of the other person in the absence of the foreman.
  • Performed such other duties that may assigned by supervisor.

Education

High School Diploma -

Mangga Cacutud High School
Arayat, Pampanga
03-1988

GED -

Gatiawin Elementary School
Arayat, Pampanga
03-1984

Skills

  • Measurement accuracy
  • Sealant Application
  • Mathematical Calculations
  • Precision measuring
  • Safety Management
  • Equipment Installation
  • Worksite preparation
  • Problem-Solving
  • Analytical Thinking
  • Analytical Skills
  • Construction knowledge
  • Multitasking

Timeline

Aluminum Installer

Symonite Panels Limited
03.2019 - Current

Foreman

Aluminum Gulf Ray
02.2010 - 10.2017

Site Foreman

Aluminum & Light Industries Co. Ltd. ALICO
08.2002 - 12.2009

Carpenter and Finishing

Way Long Construction
05.1997 - 10.2000

High School Diploma -

Mangga Cacutud High School

GED -

Gatiawin Elementary School
Jollysis Icban