Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet any and all goals. Willingness to learn new things at all times.
Overview
14
14
years of professional experience
Work History
Machine Operator Technician
Winstone Wallboards Ltd (Fletcher Building)
Penrose, Auckland
10.2022 - 02.2024
Verified conformance of finished products to specifications using various gauges such as micrometers, calipers and depth gages.
Performed regular preventive maintenance checks on all machinery including cleaning of machine parts.
Repaired worn tools or replaced them when necessary.
Loaded materials into machines ensuring proper positioning of material in relation to the tooling used.
Identified defective parts from the production line by conducting visual inspections during operation of equipment.
Adjusted machine feed and speed, changed cutters, blades, saws and other attachments as necessary.
Operated hoists, cranes and other lifting devices safely in order to move large objects around the facility.
Monitored machine operations to detect malfunctions or out-of-tolerance machining and adjusted machine controls or control media as required.
Recorded data on daily production sheets accurately detailing number of items produced each day.
Drain Layer
Top 1 Drainage
Manukau South, Auckland
05.2021 - 10.2022
Layout pipework, trenching, backfilling, fill removal, pressure testing, internal scoping and reports to the supervisor.
Packing, Shipping, and Receiving Assembler
Costa Group
Devonport, Tasmania
11.2019 - 02.2020
Stacked finished goods in designated areas within the warehouse.
Maintained a clean and safe work environment by adhering to all safety protocols and procedures.
Transported items between departments using forklifts or electric pallet jacks.
Provided support during peak periods as required.
Performed regular cycle counts of inventory to ensure accurate stock levels.
Lead Scaffold Builder
Mr Scaffold Australia Sydney Navy Base
Potts Point, Garden Island, Sydney, Aus
10.2018 - 10.2019
Complied with relevant Health and Safety legislation when working at height or near hazardous areas.
Built platforms and decks on top of existing structures as per client's specifications.
Adhered strictly to established procedures for assembling and dismantling complex access structures.
Assembled prefabricated parts into complete units or sub-units at job sites using hand tools and power tools.
Assisted with loading and unloading materials onto trucks using manual handling techniques where necessary.
Utilised fall protection systems such as harnesses when working at heights greater than two metres above ground level.
Supervised a team of scaffold builders, ensuring safety regulations were followed and quality standards met.
Advanced Scaffolder
Pro-Built Control (Visy Paperplant, Tumut)
Tumut, NSW 2720
10.2015 - 12.2015
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Worked around live machinery and ongoing operations to complete scaffolding projects on-time and under budget.
Carried heavy materials and equipment onto and in and around job sites in various climates and weather conditions.
Maintained safety and operational procedures for various projects at heights of up to 50m.
Built hung, tube and clip and modular Scaffolds.
Accurately constructed scaffolding for confined spaces.
Scaffolder
Euro Scaffolds Ltd (Te Mihi Powerstation)
Taupo, Waikato
01.2010 - 02.2012
This is where I first learned to safely erect and dismantle scaffolds. This was all done while building Te Mihi Geothermal Powerstation just outside of Taupo.
Education
Mt Albert Grammar School
Mount Albert, NZ
Skills
Mechanical Aptitude
Production Scheduling
Computer Skills
Equipment Operation
Precision measurement
Quality Control
Workplace Safety
Forklift Operation
Machine Maintenance
Quality Assurance
Comfortable at heights
Heavy Lifting
Troubleshooting
Strong leadership abilities
Timeline
Machine Operator Technician
Winstone Wallboards Ltd (Fletcher Building)
10.2022 - 02.2024
Drain Layer
Top 1 Drainage
05.2021 - 10.2022
Packing, Shipping, and Receiving Assembler
Costa Group
11.2019 - 02.2020
Lead Scaffold Builder
Mr Scaffold Australia Sydney Navy Base
10.2018 - 10.2019
Advanced Scaffolder
Pro-Built Control (Visy Paperplant, Tumut)
10.2015 - 12.2015
Scaffolder
Euro Scaffolds Ltd (Te Mihi Powerstation)
01.2010 - 02.2012
Mt Albert Grammar School
Similar Profiles
Hugh Christopher SouthonHugh Christopher Southon
Team Leader at Winstone Wallboards LtdTeam Leader at Winstone Wallboards Ltd