Competent team leader with extensive workshop experience. Knowledgeable about documentation, reporting and safety requirements. Familiar with a wide range of tools and equipment. Strategic Supervisor with expertise prioritizing projects, planning workflow and managing employees to achieve operational goals. Resourceful individual with 8 years of active experience managing efforts within deadline-driven environments. Diplomatic individual with strong leadership and decision-making skills.
Mainly fitting structural steel, little bit of pipe. had down hand fluxcore ticket, Competent in reading engineers or structural drawings.
Plaztuff is a highly durable polymer sheet that was a alternative to stainless and aluminium, It can be cut welded, folded, I used to line truck deck and hopper with it. Make tanks, walkways and kids playgrounds. It was a great product but i just couldn't generate enough work. So went back to Taranaki engineering.
Did apprenticeship in maintenance and diagnosis, but was doing more fitting of structural steel.
2006 I was in charge of installation of the structural steel at the pohokura gas plant
2008-2010
Site supervisor for up to 24 men, we installed over 2500kg of structural steel.
2010-2012
TBH, New police station pohokura gas reinjection plant
Hardworking
Ability to adapt