Seasoned Site Manager with a proven track record at 9Yards Projects Limited, showcasing exceptional construction management and leadership skills. Spearheaded diverse high-stakes projects, achieving cost-effective results while mentoring teams to excellence. Expert in building site supervision and conflict resolution, consistently delivering projects that meet rigorous safety and quality standards.

Overview

28
28
years of professional experience

Work History

Site Manager

9Yards Projects Limited
08.2022 - 08.2024
  • In March 2020, I registered my small business due to the fact that, in a lot of my previous years in the industry, working under other small companies, I was always waiting for my wages, or I would only receive a fraction of my wages until they had money to pay us.
  • Most of this work was residential, focusing on extensions, kitchen renovations or upgrades, bathroom renovations, piling, new decks, stairs, both wood and concrete, fences, floor renovations, concrete slabs, two private driveways in Remuera, and 24 subdivision driveways in Takanini.
  • All the excavation was done by me, and I prepped together with my team of four.
  • We hired a pump, and we laid the concrete; all driveway concretes were exposed and finished. The majority of this work was in Auckland, and only a few were outside of Auckland.
  • Three months in Tauranga working on a two-bedroom extension and also a 14m x 4.4m deck with steps.
  • 9 weeks in Taupo, working on a kitchen and bathroom renovation.
  • Two home renovations were in Hamilton: a whole kitchen, including the floor. We were there for 14 weeks.
  • The other was a long outside stair; I split it into two levels. This was redesigned and built by me with a hammer. (within the code of compliance)
  • It’s very hard to compete with the other small businesses, as they do a lot of undercutting, and I’m pretty much left with the crumbs. Hence, I’m folding up and looking for permanent work with a good company that can see my work ethic, experience, and skills, and put them to work.
  • I was also delivering and installing signs for ABC Photosigns in the whole of Bay of Plenty, Tauranga, Taupo, Whakatane, Tokoroa, Te Puke, to Potikirua Point. I also covered up here in Manukau Heads, Clarks Beach, and the whole of South Auckland.

Site Manager

TEAM RENO
10.2020 - 08.2022
  • I was put in charge of 18 workers on this site: foundation slabs, framing two stories, cavity systems, cladding, and interior work.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Coordinated activities with outside contractors such as architects, engineers, surveyors and inspectors.
  • I connected directly to the PM and civil engineer for the landscaping, and the location for each building/site layout.
  • Investigated accidents or incidents occurring on site; conducted root cause analysis and recommended corrective actions. Held safety meetings, Toolbox.
  • Conducted regular meetings with crew members to discuss progress updates

Site Foreman

DDL
02.2019 - 10.2020
  • I was in charge of five sites, fixing up work from framing to cladding, as well as the cavity system, and all window flashings (aluminum).
  • Another fix-up of an incomplete three-story new build in Remuera; hired a high-powered HVAC truck to clear a 23m trench at a depth of 2m to 4.2m. Worked on an elevator shaft, plus 3 separate decks
  • On the civil side of this project, I excavated car park areas and driveways.
  • Adjusted equipment to prepare for excavating and boring geological materials.
  • Established and enforced procedures and work standards, promoting team performance and safety.
  • The other site was a new-build subdivision, including excavation of the site, compaction, and having the build site tested and passed for council inspections. Managed to pass all inspections for both sites, and continued progressing.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Held safety meetings, toolbox talks, and general site updates; also conducted regular meetings with crew members to discuss progress updates, challenges encountered, and solutions implemented.

Site Foreman

P.PROS
01.2016 - 02.2019
  • Supervised a 28-person team in a 12-house subdivision.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Reporting directly to the project manager on all aspects, the ordering of materials, and the quality checks of the work.
  • I had to trim the number of guys as it was too many, and it was not necessary to have that many guys for this project.
  • Developed procedures for maintaining accurate records related to job assignments, timekeeping, inventory control.
  • Adjusted equipment to prepare for excavating and boring geological materials.
  • Communicated with suppliers and coordinated delivery of supplies to job sites.
  • Coordinated activities with outside contractors such as architects, engineers, surveyors and inspectors.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Same year I was also working for MarchCato on a 4 year water supply project..as a machine operator mainly with general duties

Leading Hand

WOODMART
09.2014 - 01.2016
  • As the leading hand at Woodmart Timber Yard, I took a year of construction to gain knowledge of the different materials used in building, including the treatments of timbers and where they can be used according to the different types of fixings and their classifications as per manufacturers.
  • Also delivered timber and building supplies to a number of sites all over New Zealand.
  • Operated hand trucks, pallet jacks, and forklifts to move materials.
  • Tagged and wrote identifying information on containers, boxes and cargo.
  • Marked and labeled containers with accurate shipping information to prevent delays.
  • Assembled cartons, crates, and containers to prepare for shipping.
  • Inspected finished products for defects or discrepancies.
  • Ensured compliance with workplace health and safety regulations by conducting safety audits regularly.
  • Carried out training sessions for new staff members on operating machinery safely.
  • Developed strategies to improve productivity levels while reducing costs.

Leading Carpenter

Sapoi & Sons
03.2011 - 09.2014
  • Worked as a supervisor and leading carpenter on a private three-story build in deep Howick, a retail renovation in Takapuna, and then moved on to Wallace Construction for a commercial new complex build in Mt. Wellington is working on civil formwork and steel structures.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.
  • Anchored and braced forms to complete precise joining.
  • I also worked on cladding for a cladding specialist company in Hobsonville (Robert); this work was under Sapoi & Sons.
  • Shaped or cut materials to proper measurements using hand tools, machines or power saws.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.

Civil Heavy Machinery Operator

AH CONSTRUCTION
07.2009 - 03.2011
  • I worked here as a civil heavy machinery operator, starting on a church project in Hillsborough under Richie’s supervision.
  • Checked fuel supplies at sites to verify adequate availability.
  • Excavation at Airport Oaks Mainfreight Distribution Warehouse.
  • Positioned or moved loads in response to hand or audio signals from crew members.
  • I was leading a crew of four on a civil sub-division complex in Ponsonby.
  • Managed inventory of supplies and equipment necessary for daily operations.
  • Excavating a new section for a gas company warehouse area in Mangere, Otahuhu.
  • Operated equipment to move and position raw materials or finished components.
  • The Project (Civil) was the Otahuhu Recreation Centre under Hanz's guidance, but on the weekends, I was the active supervisor in charge of the workers onsite.
  • Coordinated machine operations with other site personnel to keep materials moving smoothly and prevent accidents.
  • Operated compactors, scrapers or rollers to level and compact refuse at disposal grounds.
  • Adjusted handwheels and depressed pedals to control blades, buckets and scrapers.
  • Loaded and moved dirt, rocks, equipment and materials.

Carpenter

KBL Construction
01.2007 - 07.2009
  • Worked as a carpenter on a main zeal project (Springhill prison facilities) in Hamptons Down, Meremere.
  • Operated power tools safely when performing carpentry tasks such as drilling holes into lumber pieces.
  • Covered subfloors with building paper and lay hardwood or parquet floors by nailing to subfloor or cementing to mastic base.
  • Worked on Auckland Domestic Airport renovations for Air New Zealand and Qantas facilities. (internal and exterior)
  • Measured, cut, and installed staircase spindles.
  • Repaired or replaced damaged structures or components.
  • Installed interior trim work such as baseboards and moldings around windows and doors.
  • Then I last worked for them at Eden Park on the latest terraces upgrade.
  • Constructed forms for concrete pours in accordance with building codes.
  • Performed routine maintenance on carpentry equipment such as saws and drills.
  • Measured and marked cut lines on materials using ruler or marking gauge.
  • Anchored and braced forms and other structures in place using nails, bolts, anchor rods, steel cables, planks, wedges and timbers.

Leading Hand Night Shift

Precast construction
05.2005 - 01.2007
  • I was a leading hand night shift carpenter, working on the extensions of motorways, Crafton connection to North Shore, formwork, steelwork, connecting panels, and creating curbs.
  • Coordinated with other departments to ensure efficient workflow.
  • Then I was moved to Mt. Roskill, on day shift, worked on manufacturing motorway retaining panels and concrete barriers. On my quiet days, I was sent to the civil excavation sections, operating diggers or driving moxy truck loads from end to end.
  • Prepared regular reports on production output and other related activities.
  • Placed bracing, straps and other protective devices onto items in transit to prevent damage.
  • Implemented effective strategies to reduce wastage during manufacturing processes.
  • Reviewed work orders before starting work to determine necessary materials and meet deadlines.
  • Mentored employees on productivity strategies, problem resolution and specific repair strategies.

Leading Carpenter

DABL & AA Construction Ltd
03.2002 - 01.2005
  • I was working as a lead carpenter in Wellington on a complex build for over a year.
  • Installed interior trim work such as baseboards and moldings around windows and doors.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.
  • Then we were contracted to Westfield in Christ Church for almost three years, working on the huge extension of the Riccarton Mall.
  • Covered subfloors with building paper and lay hardwood or parquet floors by nailing to subfloor or cementing to mastic base.
  • Working on formwork and steel, I built a massive farmer's retail floor area and a two-story office. I also worked on a new theater (cinema) in the mall.
  • Performed various carpentry duties, including both rough and finish carpentry.
  • Anchored and braced forms to complete precise joining.
  • Installed drywall sheets onto walls or ceilings using nails or screws.
  • Laid out flooring patterns according to design templates or customer specifications.
  • Prioritized work, keeping carpentry jobs on task and within budget.
  • Adhered to project blueprints and requirements to deliver quality work.
  • Promoted team safety by keeping work areas free of hazards.
  • I also spent about four months in Kaikoura working on building new prison facilities. Making up concrete columns, formwork, and steel work. (South Pacific Builders)

Hammer Hand

Arrow Construction
02.2001 - 03.2002
  • I work as a carpenter in a retirement village project in Henderson, on Sel Peacock Drive.
  • Followed all safety guidelines and procedures, including wearing personal protective equipment.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • I also worked in the city on America’s Cup village area on a complex build, doing formwork, boxing up columns, preparing slabs for concrete pour, and steel work, too.
  • Assisted team members with maintaining orderly and clean workspaces.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Transported supplies and tools to and from work areas, ensuring they were available when needed.

Lead Carpenter

Parvez Construction
04.1999 - 02.2001
  • I worked on leading a crew of eight (8), working on concrete anchor piling, concrete foundation slabs, footings, and retaining walls, both timber and Keystones, subcontracting to Dempsey & Woods.
  • Used various carpenter's hand tools, portable power tools and standard measuring instruments.
  • Conducted inspections, diagnosed problems, took measurements and made necessary adjustments to complete projects according to specifications.
  • Troubleshot problems related to construction techniques or materials used in carpentry projects.
  • Provided guidance and technical advice to junior carpenters during project execution.
  • Managed inventory levels of supplies required for successful completion of projects.
  • Shaped materials to exact measurements for job requirements with hand tools and power equipment.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.

Hammer Hand

Precise Construction
07.1996 - 04.1999
  • I worked as a hammer hand under the leadership of Steve Coffey, working for Precise Construction, and worked on a huge project under Alliance in Auckland, at Victoria Park Market.
  • This three-story project was my first taste of high-rise work.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Followed all safety guidelines and procedures, including wearing personal protective equipment.
  • Assisted in setting up and dismantling machinery and equipment for project execution.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Assisted skilled workers with carpentry tasks as needed, and moved materials around on site.

Education

Certificate/Diploma - level 4 certificate, structural side of building/construction

UNITEC Carryington Campus
10-2010

Diploma - Private Investigator

Security & Private Investigator Academy
Auckland, NZ
09-2002

Roofing Diploma -

ATTA Academy
01.2000

High School Diploma -

Leone High School
American Samoa
06-1996

Skills

  • Building, demolition, and renovation
  • Construction management
  • Inspection principles
  • Design and planning
  • Reporting and documentation
  • Building site supervision
  • OSHA safety requirements
  • Coaching and mentoring
  • Construction supervision
  • Budgeting and cost savings
  • Cost estimation
  • Inventory management
  • Staff management
  • Facility oversight
  • Reading blueprints
  • Environmental awareness
  • Contract negotiation
  • Subcontractor management
  • Relationship building
  • Shift scheduling
  • Conflict resolution
  • Emergency assistance
  • Skilled in Microsoft
  • Flexibility and adaptability
  • Verbal and written communication

References

  • Jean Luke, ERC Ltd, Director, 0210561392
  • Paul Moniati, Team Reno, Foreman, 0212163090
  • Vikash Gounder, Woodmart, Supervisor, 021718442
  • Praise Malanga, P.Pros Ltd, Director
  • Christian Rogers, Marchcato, Supervisor

Timeline

Site Manager

9Yards Projects Limited
08.2022 - 08.2024

Site Manager

TEAM RENO
10.2020 - 08.2022

Site Foreman

DDL
02.2019 - 10.2020

Site Foreman

P.PROS
01.2016 - 02.2019

Leading Hand

WOODMART
09.2014 - 01.2016

Leading Carpenter

Sapoi & Sons
03.2011 - 09.2014

Civil Heavy Machinery Operator

AH CONSTRUCTION
07.2009 - 03.2011

Carpenter

KBL Construction
01.2007 - 07.2009

Leading Hand Night Shift

Precast construction
05.2005 - 01.2007

Leading Carpenter

DABL & AA Construction Ltd
03.2002 - 01.2005

Hammer Hand

Arrow Construction
02.2001 - 03.2002

Lead Carpenter

Parvez Construction
04.1999 - 02.2001

Hammer Hand

Precise Construction
07.1996 - 04.1999

Certificate/Diploma - level 4 certificate, structural side of building/construction

UNITEC Carryington Campus

Diploma - Private Investigator

Security & Private Investigator Academy

Roofing Diploma -

ATTA Academy

High School Diploma -

Leone High School
Lenn Luafutu