Summary
Overview
Work History
Skills
Certification
Timeline
Generic

Liton Mollah

10A Vickerman Street,Auckland

Summary

Experienced carpenter with a demonstrated history of excellence in both carpentry and general site works. Proficient in blueprint interpretation, construction planning, and executing diverse carpentry tasks with precision and efficiency. Skilled in utilizing a wide range of tools and materials to deliver high-quality workmanship. Proven ability to collaborate effectively with teams to ensure projects are completed on time. Committed to maintaining safety standards and adhering to project specifications. Seeking to leverage my expertise and dedication to contribute to the success of construction projects.

Overview

9
9
years of professional experience
1
1
Certification

Work History

Carpenter

B&H Ltd
06.2023 - Current
  • Reduced material waste by precisely measuring, cutting, and assembling lumber for various construction projects.
  • Collaborated with other skilled tradespeople to ensure seamless integration of carpentry work within larger construction projects.
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Repaired damaged doors, windows and other structures.

Carpenter & Electrical Helper

Tess Integrated Ltd
03.2022 - 03.2023
  • Performed intricate soldering tasks for circuit board repairs, ensuring longevity of electronic devices.
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Tested wiring and other system parts for electrical flow and function.
  • Installed electrical wiring through conduits and holes in both flooring and walls.
  • Replaced faulty wiring, switches and circuit breakers to reduce fire risks, boost service capacity and increase versatility.
  • Communicated daily with job site supervisor to discuss to avoid delay and issues.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Installed insulation, trim and other finishing touches.

Carpenter & Interior Worker

PQ Engineering PTE LTD
02.2019 - 02.2020
  • Completed skilled repairs of existing tile installations.
  • Created watertight finish on tiles by sealing surfaces and adding grout.
  • Mixed mortar, plaster and grout, manually or using machines according to standard formulas.
  • Applied caulk, sealants or other agents to installed surfaces.
  • Fastened joints and seams together to assemble components into sheet metal products.
  • Performed quality finishes by trimming and deburring to create smooth surfaces and joints of assembled parts.

Formwork Carpenter & Piling Work

System Foundation PTE LTD
01.2016 - 01.2019
  • Enhanced project efficiency by constructing formwork systems for concrete structures.
  • Reduced material wastage by accurately measuring and cutting materials for formwork assembly.
  • Improved worksite safety with proper installation of reinforcement bars, ensuring structural integrity.
  • Increased productivity by efficiently dismantling and cleaning formwork after concrete curing.
  • Completed complex formwork projects requiring precise measurements and cuts, demonstrating attention to detail.
  • Tied rebar into wire mesh formations using welding, wiring and clipping techniques.
  • Bending and tying rebar: Using specialized tools to bend steel bars into the required shapes and sizes and securely tying them together using wire or wire-ties.

Carpenter's Helper

CCM Industrial PTE LTD
01.2015 - 01.2016
  • Assisted with movement of materials and equipment to job sites.
  • Cut materials according to specifications in preparation for installation.
  • Installed and repaired woodwork, millwork, and cabinetry under supervision of master carpenter.
  • Assisted carpenters in constructing new homes, installing frames and assembling roofing structures.
  • Measured and cut wood pieces using hand saws and powered saws.
  • Repaired and replaced broken or worn-out wooden components in buildings.

Skills

  • Rigger & Signalman
  • Operate Power tools
  • Steel Fixing
  • Carpenter
  • Electrical Technician
  • Plumbing

Certification

  • Skill Evaluation Certificate test in Reinforcement work
  • Cor-Trade Course-Electrical Works
  • Lifting supervisor safety course
  • Rigger & Signalman course














Timeline

Carpenter

B&H Ltd
06.2023 - Current

Carpenter & Electrical Helper

Tess Integrated Ltd
03.2022 - 03.2023

Carpenter & Interior Worker

PQ Engineering PTE LTD
02.2019 - 02.2020

Formwork Carpenter & Piling Work

System Foundation PTE LTD
01.2016 - 01.2019

Carpenter's Helper

CCM Industrial PTE LTD
01.2015 - 01.2016
Liton Mollah