Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Maina Papalii

Flaxmere,Hawkes Bay

Summary

Skilled Drain Layer with significant experience in all aspects of drain installation and repair. Possess comprehensive knowledge of pipe laying, concrete work, and trenching safety protocols. Known for ability to accurately read blueprints and adhere to job specifications. Have consistently improved efficiency in previous roles, ensuring on-time project completion.

Overview

17
17
years of professional experience

Work History

Drainlayer/Excavator/Operator Foreman

Toa civil
Napier, Hawkes Bay
06.2024 - Current
  • Manage and oversee drainage works carried out on-site.
  • Provided guidance and technical support to team members regarding drainage issues.
  • Ordered necessary parts and equipment required for successful completion of jobs.
  • Reported project progress, site problems and labor status to supervisors.
  • Prepared and planned worksites to help jobs run smoothly.
  • Complied with federal and company regulations to maintain high level of job site safety.
  • Managed sites by focusing on safety, operations and productivity.
  • Reviewed blueprints and sketches to determine appropriate placement of drains and pipes.
  • Managed workers at various experience levels in construction and restoration projects.
  • Collaborated with other contractors during multi-phase projects involving multiple teams.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Supervised crew members in the installation and repair of drainage systems.
  • Resolved customer complaints related to inadequate or faulty drainage systems.
  • Coordinated with other departments to ensure that all drainage requirements were met.
  • Tracked and reported units and labor hours prior to submission of timecards.
  • Ensured compliance with local building codes when installing new drain systems.
  • Identified potential hazards at work sites prior to commencement of any operations.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Communicated with employees to demonstrate high standards and mitigate issues.
  • Adhered strictly to company policies regarding safety protocols while performing tasks.
  • Communicated with suppliers and coordinated delivery of supplies to job sites.
  • Assisted with customer requests and answered questions to improve satisfaction.
  • Identified needs of customers promptly and efficiently.
  • Operated equipment and machinery according to safety guidelines.

Drainlayer, Excavator Operator

Self Employed
Manurewa, Auckland
10.2021 - 06.2024
  • Estimated cost of labor and materials for projects and communicated value to clients.
  • Performed job tasks while complying with company's safety procedures and guidelines.
  • Created detailed reports of work performed on each job site.
  • Collaborated with other departments within the organization to ensure successful completion of projects.
  • Troubleshot and resolved technical issues, minimizing downtime and maintaining high customer satisfaction.
  • Ensured adherence to safety protocols and regulations during installation processes.
  • Maintained accurate records of all service calls, installations and repairs.
  • Enhanced customer satisfaction ratings by efficiently resolving technical, on-site and account issues.
  • Coordinated with project managers to ensure installations were completed within timelines and budget.
  • Conducted quality assurance tests post-installation to guarantee functionality and performance standards.
  • Fostered positive relationships with customers, providing advice and support on technical queries.
  • Stayed up-to-date with industry trends and best practices for installation and service processes.
  • Provided technical support to customers over the phone or in person.
  • Identified potential upgrades or additional products for customers based on their needs.
  • Demonstrated strong problem solving skills to quickly identify root cause of issues.
  • Resolved customer complaints in a timely manner while maintaining excellent customer service standards.

Drainlayer, Foreman, Excavator Operator

ADR plumbing and drainage
11b Halies Rd Whenuapai, Auckland
12.2018 - 10.2021
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Utilized laser-leveling equipment to ensure proper grading of the land around pipes or drains.
  • Conducted regular maintenance on existing drainage systems by cleaning out clogged pipes or replacing worn parts.
  • Monitored weather conditions prior to beginning work on any project involving outdoor installations.
  • Assessed pipes to ensure zero leakage and proper functionality.
  • Located underground utilities in preparation for digging and marked locations to prevent damage.
  • Excavated trenches and dug out soil to lay pipes or drains.
  • Filled pipes with sand or resin to prevent distortion for proper installation.
  • Installed underground drainage systems, including manholes and catch basins.
  • Graded and leveled trench bases using tamping machines and hand tools.
  • Provided advice on how best to maintain a functioning drainage system for customers.
  • Prepared estimates and cost of materials for prospective clients.
  • Operated rollers, front-end loaders and backhoes for site work.
  • Inspected existing drainage systems to identify problems and create solutions.
  • Resolved customer complaints promptly and efficiently.
  • Researched various products available in order to determine which ones would be most effective when installing a new system.
  • Backfilled excavated locations after completion of work to protect piping and prepare for final grading.
  • Tested newly installed drainage systems to make sure they are working properly.
  • Adhered to company equipment policies and safety procedures to avoid accidents and mishaps.
  • Located existing pipes requiring repair or replacement using magnetic and radio indicators.
  • Repaired broken or damaged drainpipes using appropriate repair methods such as patching, soldering, epoxy coating.
  • Followed written instructions, schematics and blueprints to lay out pipe in correct arrangements.
  • Ensured compliance with local building codes related to drain installation.
  • Worked effectively in team environments to make the workplace more productive.
  • Maintained updated knowledge through continuing education and advanced training.
  • Completed day-to-day duties accurately and efficiently.

Drain Layer, Foreman, Excavator Op, Flush CCTV Op

The Drainslayer ltd
Ardmore, Clevedon Auckland
02.2012 - 12.2018
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Utilized laser-leveling equipment to ensure proper grading of the land around pipes or drains.
  • Conducted regular maintenance on existing drainage systems by cleaning out clogged pipes or replacing worn parts.
  • Monitored weather conditions prior to beginning work on any project involving outdoor installations.
  • Assessed pipes to ensure zero leakage and proper functionality.
  • Located underground utilities in preparation for digging and marked locations to prevent damage.
  • Excavated trenches and dug out soil to lay pipes or drains.
  • Filled pipes with sand or resin to prevent distortion for proper installation.
  • Installed underground drainage systems, including manholes and catch basins.
  • Graded and leveled trench bases using tamping machines and hand tools.
  • Provided advice on how best to maintain a functioning drainage system for customers.
  • Prepared estimates and cost of materials for prospective clients.
  • Operated rollers, front-end loaders and backhoes for site work.
  • Inspected existing drainage systems to identify problems and create solutions.
  • Resolved customer complaints promptly and efficiently.
  • Researched various products available in order to determine which ones would be most effective when installing a new system.
  • Backfilled excavated locations after completion of work to protect piping and prepare for final grading.
  • Tested newly installed drainage systems to make sure they are working properly.
  • Adhered to company equipment policies and safety procedures to avoid accidents and mishaps.
  • Located existing pipes requiring repair or replacement using magnetic and radio indicators.
  • Repaired broken or damaged drainpipes using appropriate repair methods such as patching, soldering, epoxy coating.
  • Followed written instructions, schematics and blueprints to lay out pipe in correct arrangements.
  • Ensured compliance with local building codes related to drain installation.
  • Worked effectively in team environments to make the workplace more productive.
  • Maintained updated knowledge through continuing education and advanced training.
  • Completed day-to-day duties accurately and efficiently.

Drainlayer Apprentice

HH contractors/ Drainage Solutions
Glen Dene, Auckland
01.2008 - 12.2011
  • These were the worst years of my career, at 17yrs old have not reached adult hood and there i was playing in the sewers laughed at and picked on for the simplest things such as not remembering the 100mm pvc bends. 4years learning and training in residential drainage, pipe installation, live sewer repairs and relaying. Within these 4years i was studying at The University of Technology in Auckland for Level4 National Cert in Drainlaying.

Education

Level 4 National Certificate in Drainlaying -

UNITEC Institute of Technology
Auckland, NZ
10-2011

Skills

  • Excavation techniques
  • Subcontractor supervision
  • Trench safety
  • Asphalt repair
  • Environmental awareness
  • Concrete work
  • Pipe laying expertise
  • Stormwater management
  • Drainage system design
  • Material ordering
  • Hazardous materials handling
  • Confined space entry
  • Sewer line installation
  • Adherence to regulations
  • Backfilling procedures
  • Effective communication skills
  • Pre-operational equipment inspections
  • Written and verbal communication
  • Trench work
  • Heavy equipment operator
  • Site preparation
  • Site supervision
  • Drainage maintenance
  • Trenching techniques

Languages

Samoan
Professional

Timeline

Drainlayer/Excavator/Operator Foreman

Toa civil
06.2024 - Current

Drainlayer, Excavator Operator

Self Employed
10.2021 - 06.2024

Drainlayer, Foreman, Excavator Operator

ADR plumbing and drainage
12.2018 - 10.2021

Drain Layer, Foreman, Excavator Op, Flush CCTV Op

The Drainslayer ltd
02.2012 - 12.2018

Drainlayer Apprentice

HH contractors/ Drainage Solutions
01.2008 - 12.2011

Level 4 National Certificate in Drainlaying -

UNITEC Institute of Technology
Maina Papalii