Carpenter
*Precaster at CALDER STEWART
-CLEANING DECK
-MOULDING(start lay-out,put shutter or formply,put magnet to make your box strong and make it alling,put all far face items like tims, ducts, lifter, rb, pipe,etc)
-CAST IN ITEMS(Put oil in the deck and in the box,drop cages, put all near face tims rb,ducts, pipe,litfers etc)
-CONCRETING(pour concrete ang finish the panel)
-DE-MOULD(strip magnet,shutter,clean all tims,lifters,etc)
*Carpenter at AUSTIN CONTRACTING
-Boxing footpath,driveway,drainage,excavation,digging and concreting
*Carpenter at JLC CONSTRUCTION
-cladding,walling,framing,
-Installed drywall sheets onto walls or ceilings using nails or screws.
-Built jigs and fixtures to assist in the production of parts.
-Read blueprints, schematics and drawings to determine layout requirements.
-Cut timber, panels and other wooden materials according to measured dimensions.
*Precast work at CANCAST
-CLEANING DECK
-MOULDING(start lay-out,put shutter or formply,put magnet to make your box strong and make it alling,put all far face items like tims, ducts, lifter, rb, pipe,etc)
-CAST IN ITEMS(put oil in the deck and in the box,put all items like lifters, tims, rb, ducts, pipe, etc)
-CONCRETING(pour concrete and finish the panel)
-DE-MOULD(Strip magnet, shutter and clean all tims, lifters, ducts, pipe,etc)