Summary
Overview
Work History
Timeline
Generic
Marlon  Perante

Marlon Perante

Auckland

Summary

Experienced with team management, safety protocols, and project coordination. Utilizes strong leadership to guide teams and ensure project milestones are met. Track record of maintaining high safety standards and delivering quality work.

Overview

17
17
years of professional experience

Work History

Leading Hand Scaffolder

Tana Scaffolding Limited
03.2022 - 02.2025
  • Managed on-site material inventory, ensuring adequate supply of components for uninterrupted workflow.
  • Implemented best practices in fall protection and hazard identification, reducing incidents of workplace accidents.
  • Collaborated with project managers to develop effective scaffolding solutions tailored to project requirements.
  • Maximized overall project efficiency through proactive management of labor allocation and task scheduling for the scaffolding team.

Advance Scaffolder

Caledonia Scaffolding LTD
07.2019 - 02.2022

 Erect, Erect, modify and dismantle scaffolding as per NZ Standards and job specifications  Completion of risk assessments before each task and where the scope of work has changed.  Interpret plans, drawings and written instructions and comply with project specifications to complete works. (as applicable to job role)  Meet both quality and productivity targets in erecting and dismantling scaffolding  Ensure erected and tagged scaffold, is accompanied by a completed handover certificate and job card in accordance with site, client and or project specific instructions (as applicable to job role)  Participate in and contribute to daily pre-starts, weekly tool box meetings and other health and safety initiatives and training.  Report all hazards, incidents and near misses to Supervisor and or HSE Advisor and all other applicable and notifiable employees  Comply with company and site PPE requirements at all times  Provide direction to labourers as required  Creation and compliance with JHA’s/SWMS etc  Check levels in scaffolding structures  Inspect and tag scaffolding and in accordance with site, client and or project specific instructions (as applicable to job role)  Maintain professional code of conduct at modify and dismantle scaffolding as per NZ Standards and job

Advance Scaffolder

Empire Scaffolding
01.2018 - 02.2018

Overview

Alterations , and dismantles scaffolding structures for construction, maintenance, and repair projects while adhering to safety standards and regulations. Key responsibilities include site hazard identification, design and calculation of scaffold loads, team leadership, equipment maintenance, and working at heights, often involving physical labour and teamwork on diverse projects.

Key Responsibilities

  • Erection and Dismantling:Safely assemble and disassemble temporary scaffolding structures, such as work platforms, ramps, and shoring.
  • Site Assessment:Inspect worksites for potential hazards, calculate necessary loads, and design suitable scaffold structures for each project.
  • Safety and Compliance:Ensure all scaffolding and equipment meet New Zealand's safety standards and regulations, conducting regular inspections and maintenance.

Scaffolding Supervisor

Alghanim International General Trading & Contracting Co. WLL .
11.2016 - 07.2017
  • Developed detailed scaffolding plans, optimizing material usage and minimizing waste.
  • Increased client satisfaction by ensuring adherence to project specifications while exceeding expectations in terms of quality, safety, and timeliness.
  • Enhanced team productivity by implementing efficient work processes and staff training programs.
  • Maintained high quality standards in all projects by closely monitoring progress and making necessary adjustments as required.

Advance Scaffolder

CAPE EAST/ HMC HEEREMA MARINE CONTRACTOR
10.2007 - 07.2015
  • Worked around live machinery and ongoing operations to complete [Number] scaffolding projects on-time and under budget.
  • Maintained safety and operational procedures for [Number] projects at heights of up to [Number] feet.
  • Developed customized solutions for complex projects, adapting scaffolding configurations to suit unique client needs.
  • Maintained detailed records of work completed, ensuring accurate billing and efficient resource allocation.

Timeline

Leading Hand Scaffolder

Tana Scaffolding Limited
03.2022 - 02.2025

Advance Scaffolder

Caledonia Scaffolding LTD
07.2019 - 02.2022

Advance Scaffolder

Empire Scaffolding
01.2018 - 02.2018

Scaffolding Supervisor

Alghanim International General Trading & Contracting Co. WLL .
11.2016 - 07.2017

Advance Scaffolder

CAPE EAST/ HMC HEEREMA MARINE CONTRACTOR
10.2007 - 07.2015
Marlon Perante