I mainly worked on flood damaged houses and a some renovations. I would help measure up the damaged part fo the house and calculate the materials required for the job. than would proceed to remove and demolish any damage. would than alow the room to dry. After the room is dried I reinstated the gib and organised for sub trades to come in. proceeded to continue work until the house was back to its original state.
Helped laying out markings for slabs and piles. Using survey pegs to find the correct position of the slab]. supervise the digger while they dig the footing of the slab. using a laser to ensure that they dig to the right height. helped install shudders for the concrete. measured the slab to ensure it was square and the right size. for piles marked out the piles and made sure they were all in line with each other. supervised the digger as they drilled the holes making sure they are the correct depth. Placed piles in the hole and braced them so they were plum. after poring the concrete used a laser and a level to cut the piles to the correct height.
I was responsible for picking, packing and dispatching customer orders. I worked here full time over the school holidays
I teach teach group and or individual students sailing. This involves looking after them on the water, helping them improve on their skills, and the rules that apply during a regatta.