Summary
Overview
Work History
Education
Skills
Timeline
Generic

Moli Patu

Manurewa,AUK

Summary

I have been in the construction industry for over 9 years, working in Steel structures, carpentry and concrete. With strengths In graphics from a young age, I am well equipped in my knowledge of plan reading and been a vital leader of my current team members how to read drawings and construct the design required.

I have a hands on approach, with a good eye for detail, clear communication and am good at both leading and following instruction. I enjoy sports and the outdoors, and am looking to now advance my position in a company that appreciates my skills and knowledge. I am confident in what I do, and am eager to learn more in the industry.

Overview

12
12
years of professional experience

Work History

Steel Fixer

Hynds Pipe Systems
Pokeno, WKO
06.2019 - Current

In this role I am responsible for building pre-fabricated cages such as pipes, box culverts and panels, to the specifications of the civil engineers designs. I frequently receive praise from the quality assessors for my eye for detail and problem solving.

Steel Fixer

Complete Reinforcing
East Tamaki, AUK
04.2015 - 05.2019

Under Complete Reinforcing I have worked on many different commercial projects including the Southern Corridor, also on the City Rail Link (CRL), Waiparuru Hall, and various apartment projects among others. I am also responsible for the pre-fabrications, reading and instructing my team on structural drawings and communicating with engineers.

Steel Fixer (Sub Cont.)

Fletcher Reinforcing
Auckland, AUK
03.2014 - 04.2015

In this role I was a tie hand team leader, working on construction of the Manukau Bus Station which was an 18month project

Hammer Hand

Parks Construction Ltd, AKL
Auckland, AUK
04.2012 - 12.2013

As a contractor I took on work with Parks Construction in residential new builds from foundation to finished product.

Education

NCEA Level 3 -

The Manurewa High School
Manurewa, AUK
12.2006

Skills

  • Power Tool Operation
  • Reinforcement placement
  • Construction safety
  • Plan interpretation
  • Gantry crane operation
  • Leadership and on-site instruction

Timeline

Steel Fixer

Hynds Pipe Systems
06.2019 - Current

Steel Fixer

Complete Reinforcing
04.2015 - 05.2019

Steel Fixer (Sub Cont.)

Fletcher Reinforcing
03.2014 - 04.2015

Hammer Hand

Parks Construction Ltd, AKL
04.2012 - 12.2013

NCEA Level 3 -

The Manurewa High School
Moli Patu