Over 28 years in Civil Construction, I have developed the technical skills required to take on major projects with complex challenges and deliver best for project outcomes.
Best for project to me, is building high performing teams that function under stress and pressure to deliver exceptional work to a safe and high standard.
Te Ahu a Turanga Manawatu Tararua Highway Project, HEB Fulton Hogan Alliance, $560M, Senior Project Engineer
Managing a team of up to 11 engineers and a site crew of up to 70 people delivering the construction of a 300m long four span Balance Cantilever Bridge across the Manawatu River worth $90M.
Transmission Gully Project, CPB HEB Joint Venture, PPP, June 2015 to June 2020, $850M, Senior Project Engineer
Responsible for planning and executing the projects flagship structure being the Cannons Creek Bridge or more commonly known as Bridge 20. Br20 is a three span, 226m long, 60m high, incrementally launched box girder superstructure valued at $42M. Promoted to SPE by July 2018.
Cambridge Bypass Project, $130M, Project Engineer
Responsible for the planning and construction of the 200m long, 4 span Karapiro Viaduct bridge. Construction consisted of piled foundations, pile caps and twin 2.6m diameter columns up to 36m tall that support the 520t pier heads. Superstructure consisted of weathering steel girders that were erected in-situ. Precast deck panels for composite deck construction.
Graduating WINTEC I worked on various small projects as a Site Engineer. During this time, 10 months was spent on the Kopu Bridge Replacement Project. Responsibilities mostly temporary works related for in-situ girder splicing.
Four months in 2013 I was involved in the Transmission Gully tender where i developed methodologies, temporary works and lift plans for the 28 structures.
Worked for Smithbridge as a Senior Site Welder in New Zealand, Australia 2 years and Guam 2 years. Works related to building various temporary works in the workshop then site assembly. Moving to only site based welding work included splicing pile casings, implementing temporary works and general site fabrication including crane jib repairs.
Various projects included: