Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Projects
Timeline
Generic

ORLANDO JR GRACIA

Christchurch,Hornby

Summary

Commonly called as "Don" among friends and colleagues, an enthusiastic Mechanical Engineer and a Project Manager, who enjoys being part of a successful and productive team. Quick to grasp new ideas and concepts, and to develop innovative and creative solutions to problems. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Actively seeking and maintain a full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

23
23
years of professional experience

Work History

Project Manager

Christchurch City Council
01.2022 - Current
  • Leads and manages council 3 waters infrastructure projects, responsible for planning, monitoring, controlling, and managing large and multi-stream projects to time, cost and scope
  • Prepares detailed project plan for development, production, and communication, and schedule of milestones
  • Prepares NZS 3910/3916 contract documents including Request for Quotations, Scope of Work, pricing schedules and specifications, evaluates letting of contracts, tenders, and recommendations to clients
  • Collaborates with various consultants, project managers, stakeholders, and contractors to achieve project objectives to support council’s over-all business goals and keep projects in time, in scope and in budget
  • Provides expertise in creation of council projects from conception to operation producing feasibility, concept, detail design, construction design and commissioning stages.

Senior Engineer - Mechanical

Christchurch City Council
01.2017 - 01.2022
  • Applied council's Infrastructure Design Standards, Construction Specification Standard and AS/NZS code requirements to all designs.
  • Lead Engineer that managed and checked design compliance with project specifications and standards requirements for other engineering disciplines
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Define and solve complex mechanical engineering problems where there is need to integrate site constraints, requirements of the client, public safety, statutory requirements, and Council priorities
  • Provides and develops sound technical advice on wide range of specialist mechanical engineering issues that will often have significant financial impact for council and ratepayers including concepts and solutions
  • Manages, supervises and lead design services for construction of potable water wells within Christchurch City as well as Banks Peninsula
  • This includes hydraulic design, mechanical design, structural and electrical disciplines
  • Work includes drinking water standards well upgrades, wells for growth and renewal wells, including feasibility studies, investigation, detailed design and construction observation and audits.
  • Managed construction administration and value engineering process

Asset Engineer

Christchurch City Council
01.2012 - 01.2017
  • Lead and maintain a sound technical knowledge of pumping, head works and/or electrical equipment including selection, installation, operation and maintenance and condition assessment
  • Particularly in respect to Water Supply, Wastewater, and Land Drainage activities
  • Prioritise, scope, establish, and brief individual projects for the implementation of the renewal, refurbishment programmes
  • Manage or sponsor, as appropriate, project work and teams to ensure work is delivered on time, to standard and to budget
  • Provide technical expertise and input into the development of selected capital, operational and maintenance works programmes and budgets.

Mechanical Engineer

AECOM NZ
06.2012 - 09.2012
  • Mechanical design engineer specializing in the field of Building Services
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Attended stakeholder coordination meetings to coordinate and engage in relationship building.


Sr. Mechanical Engineer

AECOM Philippines
01.2011 - 01.2012
  • Mechanical design specializing in the field of Water/ Wastewater, E&M equipment for pump stations, both for water and Wastewater, Building Services – HVAC & Bulk Fuel Storage and Piping, and Mining.

Offshore HVAC Engineer

Hi-Air Korea Co., Ltd
01.2007 - 01.2010
  • Designed systems and specified components for successful installation and operation for HVAC systems to be used for Off-shore facilities and transportation of crude oil, Liquefied Natural Gas using industry standards such as BV or DNV.
  • Helped manufacturing and installation engineers make accurate assessments and plans during construction
  • Compiled operational, performance and safety data on HVAC and support systems documentation for offshore use.

Electro-Mechanical Engineer

Greenwhich Foods Corporation
01.2001 - 01.2007
  • Electro-mechanical engineering design of the building services required for quick-service restaurants located around the Philippines

Education

Diploma - Construction Management

Ara Institute of Canterbury
Christchurch, NZ
2024

Bachelor of Science - Mechanical Engineering

University of The Philippines
Diliman, Philippines
10.2000

Skills

  • Project Management
  • Project Estimation and Bidding
  • Expense Reports
  • Contract Management
  • Budget Administration
  • Project Development
  • MS Office Suite
  • SAP
  • SCADA
  • MS Visio
  • Basic AutoCAD

Accomplishments

  • NZS 3910 Engineer's Representative and Contractor's Representative Workshop (IPWEA, Mar
  • 2015)
  • Confined Space and Gas Detection (Safety N'Action, April 2013 and June 2015)
  • Asset Management 101 (NAMS, Feb 2013)
  • Optimised Decision Making (NAMS, May 2013)
  • Presentation Skills
  • Quality Management Course – SIT
  • Risk Management Course - SIT

Affiliations

  • Member, Project Management Institute
  • Member, Water NZ

Projects

WW Riccarton Interceptor (Upper Riccarton)

  • $12M project to lay a DN600 WW interceptor along Maidstone, Creyke and Clyde Rd to increase capacity in the Riccarton Interceptor catchment to reduce overflows to the environment and provide for growth in the upper catchment (airport, Dakota Park, Memorial Avenue Investments Ltd and Hawthornden Road greenfield residential area).


 WS Grampian Street Suction Tank Renewal 

  • $5M project to build a new suction tank for Grampian Water Supply pump station over at the North-West of Christchurch that meet current asset and drinking water quality standards.


 WW Banks Peninsula Pumping & Storage Equipment Renewals

  • $0.7M project to upgrade Mechanical, Electrical & Electronic, Instrumentation, Control & Automation Reactive renewal and replacement to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards of three Banks Peninsula WW stations.


 WS Banks Peninsula Pumping & Storage Equipment Renewals 

  • $0.25M project to upgrade Mechanical, Electrical & Electronic, Instrumentation, Control & Automation Reactive renewal and replacement to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards of two Banks Peninsula WS stations.


Pressure Main 11 Repair

  • A reactive renewal project to quickly repair a live pressure main leading to the city's treatment plant at Bromley when this was accidentally punctured by a contractor.

 

WS Mains Silvester, et. al. Renewal

  • $4.75M project to renew the water supply mains and sub-mains on various streets around Woolston as identified as pipes to be renewed that has generally scored poorly in Asset Assessment Intervention Framework (AAIF) Repairs, Maintenance and Operations (RMO) schema.


WS Mains Halswell, et. al. Renewal

  • $2.1M project to renew the water supply mains and sub-mains on various streets around Halswell as identified as pipes to be renewed that has generally scored poorly in Asset Assessment Intervention Framework (AAIF) Repairs, Maintenance and Operations (RMO) schema. This project involves laying pipes along NZTA Waka Kotahi roads.


 WS Redwood Pump Station Well 1 & Well 2 Renewal 

  • Design lead for the renewal of the replacement of two wells at Redwood pump station with deep wells and secure above ground well heads


WS Spreydon Well Head Conversion 

  • Design lead for the renewal of the replacement of three wells at Spreydon pump station with deep wells and secure above ground well heads


 WS Above Ground Well Head Conversions 

  • Design reviewer to implement above ground well heads at Aston, Woolston and Parklands. Above-ground wellheads are required to demonstrate well head security which will ultimately aid the goal to re-establish the 'secure bore' status for Christchurch.

Timeline

Project Manager

Christchurch City Council
01.2022 - Current

Senior Engineer - Mechanical

Christchurch City Council
01.2017 - 01.2022

Mechanical Engineer

AECOM NZ
06.2012 - 09.2012

Asset Engineer

Christchurch City Council
01.2012 - 01.2017

Sr. Mechanical Engineer

AECOM Philippines
01.2011 - 01.2012

Offshore HVAC Engineer

Hi-Air Korea Co., Ltd
01.2007 - 01.2010

Electro-Mechanical Engineer

Greenwhich Foods Corporation
01.2001 - 01.2007

Diploma - Construction Management

Ara Institute of Canterbury

Bachelor of Science - Mechanical Engineering

University of The Philippines
ORLANDO JR GRACIA