Rahul is a results-driven Senior Project Manager with extensive experience managing high-pressure transport and construction projects, including design and construction phases procured through the TTEPS Panel. Adept at fast-tracking complex projects requiring flexibility across both design and construction life cycles, he excels in proactive cost management, program delivery, and stakeholder engagement, ensuring adherence to timelines and budgets. His engineering and construction background strengthens his ability to communicate technical requirements effectively, aligning client expectations with on-ground execution. Rahul has successfully led MSQA initiatives for critical TEPs projects, such as signal enhancements, raised speed crossings, and rural road safety upgrades, resolving conflicts and minimizing disruptions. Known for balancing technical precision with stakeholder priorities, he consistently delivers outcomes that meet safety, quality, and financial targets in dynamic environments.
Kainga Ora Demolition Works, Glen Innes, $10m, 2024, Rahul leads the as Engineer’s Representative for three demolition contracts ongoing in parallel, which involved routing site inspections, claim certification, processing variations, liaising with contractor and contamination specialists.
· Project Manager for the Dairy Flat Hwy, Goodall Rd, Puhoi Rd, Albert St, Pakiri Road and Wech Drive Footpath Packages under the Auckland Transport, 2023, $2m. Rahul adeptly managed the end-to-end delivery of two rural footpath projects. From leading the initial investigations to overseeing detailed designs, he ensured timely statutory consents and external assessments synchronised with the respective design phase. He consistently updated the client, highlighting program progress, monthly reports, and emerging risks. Despite encountering design challenges, notably the need for footpath retaining and subsequent structural assessments, Rahul coordinated with the team to secure essential building consents, ensuring the project's seamless progression to final design with minor adjustments.
· MSQA for Bikenhead T3 mid-block Signal for Auckland Transport, $3m, 2022. Rahul led the MSQA for the Birkenhead mid-block signal project. He ensured contractors met design standards through regular site visits and inspections. When design conflicts caused a construction hold, he maintained open communication between the design team, AT, and contractors, ensuring stakeholder alignment. While the redesign was beyond his control, Rahul's proactive communication helped manage expectations, and the project eventually progressed to completion, within acceptable timeframes.
· MSQA for the Great South Road, Broadway and Alpers Avenue intersection improvement for Auckland Transport, $4m,2022. Rahul led the MSQA for an improvement on 5-way intersection in Newmarket, Rahul consistently monitored the site, ensuring adherence to design standards and attending pre-pour inspections. Due to the commercial nature of the location, numerous service conflicts emerged throughout construction. Yet, thanks to Rahul's adept communication with designers, contractors, and AT, these challenges were addressed efficiently, mitigating project delays and costs.
· Engineers Representative for City Rail Link Impact Mitigation Project for Auckland Transport, $5m, 2020. The project involved implementing roading network changes to service existing bus network around Mt Eden Station and Karangahape Station construction site. These interventions were urgently required to minimise City Rail Link construction impacts on public transport and active modes. Rahul was responsible for end-to-end project management, and managed everything from contract procurement, the investigation and detailed design phases, to securing statutory consents and managing the construction process. Regular interactions with the AT team and pivotal stakeholders were coordinated by Rahul, propelling multiple CRL designs from conception to execution. His proactive approach in spotlighting potential risks and resolving recurring challenges ensured the timely completion of all CRL intervention projects under his management.
· Project Manager for Bush Road Footpath Package for Auckland Transport, $4m. Rahul managed the pedestrian improvement footpath project from concept to final design. He consulted with the design team and stakeholders for necessary external assessments like Lighting Design. While tracking the program and ensuring key milestones, he adeptly navigated a challenge with tree asset approval. When council specifications clashed with the footpath design, Rahul facilitated discussions among Council, AT, and the arborist, resolving the issue without altering the design and securing Tree Owner approval.
· Project Manager for Metro Customer and Local Bus Shelter Package – Traffic Audit for Auckland Transport Project Delivery Team, $15m, 2022. Johnstaff was engaged for full project management services including procurement of contracts, management of investigation phase, managing public feedback on bus shelter proposals and detailed design. Johnstaff was engaged for full project management services including procurement of contracts, management of investigation phase and detailed design, statutory consents, procurement of construction contracts and construction phase management.
· Project Manager for Optimisation Planning & Performance for Auckland Transport, $7m, 2019. The services provided were Project Management to assist with the delivery of the OPEX and CAPEX programmes for the client. This included assisting the client with the development of a 5-year rolling programme of projects for investigation.
· Project Manager for the Network Optimisation Programme Building & Advisory, Auckland Transport, $10M, 2020. The scope of this project included conducting desktop investigation, on-site observations, identifying project objectives as well as possible solutions – a holistic scoping exercise. Johnstaff was engaged in an Advisory role to assist the Client with setting out a key investment decision making framework to build their portfolio of capital works.
· Engineers Representative for the Lady Ruby Drive and Kerwyn Avenue Signal Improvement for Auckland Transport Integrated Networks Team, $1m, 2021. Johnstaff was engaged for full project management services including management of contracts, Client side Management, Stakeholder Management, Quality Assurance and Construction Phase Management.
· Engineers Representative for the Alfriston Road and Magic Way Signal Improvement for Auckland Transport Integrated Networks Team, $1m, 2021. Johnstaff was engaged for full project management services including management of contracts, Client side Management, Stakeholder Management, Quality Assurance and Construction Phase Management.
· Engineers Representative for the Dairy Flat Highway Road marking project for Auckland Transport Road Safety Team, $1m, 2021. Johnstaff was engaged for full project management services including management of contracts, Client side Management, Stakeholder Management, Quality Assurance and Construction Phase Management.
Previous Employment Experience
• Construction Manager for Road Rehabilitation works: Auckland Central Maintenance Contracts for Downer, $20m, 2013-2017. The services included Construction Management, Cost Management, Stakeholder Management, Quantity Surveying for rehabilitation of pavement and public drainage infrastructures for Central Auckland region, including reinstating footpath, vehicle crossings, berm, kerb/channels, dish channels, cesspits etc.
• Civil Engineer and Construction Supervision for Kainga Ora - Emergency Housing Residential Tenancy Projects, $6m, 2018-2019. The services included Stakeholder Management, Design Management, Construction Monitoring, Quality Assurance, Buildability & Staging Advice for construction of public drainage and pavement on multiple minor residential developments.
• Construction Manager for Road Rehabilitation works: Auckland West Maintenance Contracts for Liveable Streets, $10m, 2013-2017. The services included Construction Management, Cost Management, Stakeholder Management, Quantity Surveying for rehabilitation of pavement and public drainage infrastructures for Central Auckland region, including reinstating footpath, vehicle crossings, berm, kerb/channels, dish channels, cesspits etc.
• Construction Manager for Orakei Basin Access Road Carpark Renewal for Auckland Council, $1m, 2016. The services included Construction Management, Procurement Advice, Stakeholder Management, Quantity Surveying for rehabilitation of the Orakei basin, including construction of retaining walls, drainage, and pavement.
• Construction Manager for Hellabys Sidings Bridge Underpass Repairs Detail for Auckland Transport, $200k, 2015. The services included Construction Management, Procurement Advice, Stakeholder Management, Quantity Surveying for sealing up underpass space, with Geofoam, concrete and timber fencing.
• Construction Manager for Northern Pond Desilitation Works Ferry Road Pond & Hamatana Road Pond for Auckland Council – Albany Ward, $200k, 2015. The services included Construction Management, Procurement Advice, Stakeholder Management, Quantity Surveying for dewatering and desilitation work.
• Project Manager for the Dairy Flat Hwy, Goodall Rd, Puhoi Rd, Albert St, Pakiri Road and Wech Drive Footpath Packages under the Auckland Transport, 2023, $2m. Rahul adeptly managed the end-to-end delivery of two rural footpath projects. From leading the initial investigations to overseeing detailed designs, he ensured timely statutory consents and external assessments synchronised with the respective design phase. He consistently updated the client, highlighting program progress, monthly reports, and emerging risks. Despite encountering design challenges, notably the need for footpath retaining and subsequent structural assessments, Rahul coordinated with the team to secure essential building consents, ensuring the project's seamless progression to final design with minor adjustments.
• MSQA for Bikenhead T3 mid-block Signal for Auckland Transport, $3m, 2022. Rahul led the MSQA for the Birkenhead mid-block signal project. He ensured contractors met design standards through regular site visits and inspections. When design conflicts caused a construction hold, he maintained open communication between the design team, AT, and contractors, ensuring stakeholder alignment. While the redesign was beyond his control, Rahul's proactive communication helped manage expectations, and the project eventually progressed to completion, within acceptable timeframes.
• MSQA for the Great South Road, Broadway and Alpers Avenue intersection improvement for Auckland Transport, $4m,2022. Rahul led the MSQA for an improvement on 5-way intersection in Newmarket, Rahul consistently monitored the site, ensuring adherence to design standards and attending pre-pour inspections. Due to the commercial nature of the location, numerous service conflicts emerged throughout construction. Yet, thanks to Rahul's adept communication with designers, contractors, and AT, these challenges were addressed efficiently, mitigating project delays and costs.
• Engineers Representative for City Rail Link Impact Mitigation Project for Auckland Transport, $5m, 2020. The project involved implementing roading network changes to service existing bus network around Mt Eden Station and Karangahape Station construction site. These interventions were urgently required to minimise City Rail Link construction impacts on public transport and active modes. Rahul was responsible for end-to-end project management, and managed everything from contract procurement, the investigation and detailed design phases, to securing statutory consents and managing the construction process. Regular interactions with the AT team and pivotal stakeholders were coordinated by Rahul, propelling multiple CRL designs from conception to execution. His proactive approach in spotlighting potential risks and resolving recurring challenges ensured the timely completion of all CRL intervention projects under his management.
• Project Manager for Bush Road Footpath Package for Auckland Transport, $4m. Rahul managed the pedestrian improvement footpath project from concept to final design. He consulted with the design team and stakeholders for necessary external assessments like Lighting Design. While tracking the program and ensuring key milestones, he adeptly navigated a challenge with tree asset approval. When council specifications clashed with the footpath design, Rahul facilitated discussions among Council, AT, and the arborist, resolving the issue without altering the design and securing Tree Owner approval.
• Project Manager for Metro Customer and Local Bus Shelter Package – Traffic Audit for Auckland Transport Project Delivery Team, $15m, 2022. Johnstaff was engaged for full project management services including procurement of contracts, management of investigation phase, managing public feedback on bus shelter proposals and detailed design. Johnstaff was engaged for full project management services including procurement of contracts, management of investigation phase and detailed design, statutory consents, procurement of construction contracts and construction phase management.
• Project Manager for Optimisation Planning & Performance for Auckland Transport, $7m, 2019. The services provided were Project Management to assist with the delivery of the OPEX and CAPEX programmes for the client. This included assisting the client with the development of a 5-year rolling programme of projects for investigation.
• Project Manager for the Network Optimisation Programme Building & Advisory, Auckland Transport, $10M, 2020. The scope of this project included conducting desktop investigation, on-site observations, identifying project objectives as well as possible solutions – a holistic scoping exercise. Johnstaff was engaged in an Advisory role to assist the Client with setting out a key investment decision making framework to build their portfolio of capital works.
• Engineers Representative for the Lady Ruby Drive and Kerwyn Avenue Signal Improvement for Auckland Transport Integrated Networks Team, $1m, 2021. Johnstaff was engaged for full project management services including management of contracts, Client side Management, Stakeholder Management, Quality Assurance and Construction Phase Management.
• Engineers Representative for the Alfriston Road and Magic Way Signal Improvement for Auckland Transport Integrated Networks Team, $1m, 2021. Johnstaff was engaged for full project management services including management of contracts, Client side Management, Stakeholder Management, Quality Assurance and Construction Phase Management.
• Engineers Representative for the Dairy Flat Highway Road marking project for Auckland Transport Road Safety Team, $1m, 2021. Johnstaff was engaged for full project management services including management of contracts, Client side Management, Stakeholder Management, Quality Assurance and Construction Phase Management.