Dynamic Site Engineer with a proven track record at Smith Crane and Construction, excelling in project planning and quality assurance. Skilled in stakeholder communication and analytical problem solving, I effectively manage site operations, ensuring compliance with safety standards and timely project handovers, contributing to enhanced workflow efficiency and client satisfaction.
Overview
7
7
years of professional experience
1
1
Certification
Work History
Site Engineer
Smith Crane and Constrution
12.2023 - Current
Pre-Construction Phase: Planning & Preparation
Review project drawings, specifications, and contract documents to understand scope and technical requirements.
Participate in site investigations and feasibility assessments to ensure readiness for construction.
Assist in preparing method statements and resource plans for upcoming works.
Coordinate with architects, consultants, and clients to clarify design details and resolve discrepancies.
Prepare material take-offs and requisitions based on project needs.
Ensure all permits, utilities, and preliminary site setups are in place before mobilization.
Construction Phase: Execution, Supervision & Progress Reporting
Supervise daily construction activities, ensuring compliance with approved drawings, specifications, and safety standards.
Manage site labor and subcontractors, monitoring performance and quality.
Coordinate timely delivery and proper use of materials, tools, and equipment.
Ensure implementation of health, safety, and environmental (HSE) policies on-site.
Conduct regular quality checks and inspections, addressing non-conformities as needed.
Prepare and submit weekly progress reports to project management and clients, highlighting accomplishments, issues, and areas requiring attention.
Attend progress meetings, providing technical updates and resolving site-level challenges.
Resolve on-site technical issues promptly, escalating when necessary.
Maintain comprehensive site records, including daily logs, labor reports, inspection checklists, and test results.
Post-Construction Phase: Handover & Close-Out
Oversee the inspection and rectification process, ensuring all identified defects are systematically recorded, tracked, and resolved in accordance with project quality standards.
Prepare and verify as-built drawings, Operations & Maintenance manuals, as well as final handover documentation.
Support the formal handover of the project, ensuring all deliverables and approvals are completed.
Participate in post-project evaluations, contributing insights to improve future project execution.
Foreman/Carpenter
Fleetwood Construction
05.2018 - 06.2023
Supervised daily operations ensuring safety and efficiency in workflow.
Coordinated team efforts to achieve project goals and deadlines.
Trained new workers on construction and safety best practices for optimal performance.
Interpreted specifications and technical drawings, translating designs into accurate constructions.
Supervised daily operations to ensure project deadlines were met consistently.
Coordinated equipment and material deliveries, optimizing workflow efficiency on-site.
Collaborated with project managers to address site issues and streamline processes.
Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
Reviewed project details to specify correct materials and equipment for job sites.
Implemented efficient work processes to boost overall productivity while reducing costs.
Experienced in set out, excavations, concrete and pile foundations, structural steel, timber framing, decks, linings, windows and doors, flashings and roofing, flooring, interior doors, interior joinery, trim etc
Education
Diploma - Construction Management
Open Polytechnic
Christchurch, NZ
11-2023
NZQA - National Certificate in Carpentry -
BCITO
03-2021
Level 2
NCEA
01-2016
Level 1
NCEA
01-2015
Skills
Site inspections
Assisting project management
Construction Management
Quality Assurance
Health and Safety
Project Planning
Directing employees
Reporting
Analytical problem solving
Project Handover procedure
Plant and Material procurement
Stakeholder communication
Certification
Licensed building practitioner (LBP) - (2023-persent)