Summary
Overview
Work History
Education
Skills
Timeline
Generic

Terry Sun

NZ Permanent Resident

Summary

Career background: 5 years of engineering design plus 2 years of building services and plant maintenance Experience, including 1 year of project management position. Solid knowledge of Electrical Code of Practice and AS/NZS standard, familiar with plant development and building service management, familiar with manufacturing process, equipment maintenance, process and equipment improvement

Personability: Honest, practical and energetic, well-organized person with high level of attention to details, innovative thinking of fault analysis and problem solving, team player with great collaborative spirit

Overview

9
9
years of professional experience

Work History

Electrical Engineer Technician

Acclaim Electrical
Auckland
09.2021 - Current
  • EWRB registered electrician to carry out prescribed electrical installing including: new house wiring, kitchen and bathroom renovation, Alarm & CCTV system, heat pump and solar system, underfloor heating etc.
  • Work with teams to install and maintenance electrical equipment and wiring systems at various commerical, and residential sites, usually LV and ELV, AC and DC systems. Design electrical and fiber systems using AutoCAD

Project Manager

NHS Pharmaceutical
Manukau, Auckland
01.2021 - 09.2021
  • Accomplish 2000 square meters size of plant construction tasks with high standard and quality, including the pre-construction procedures and after construction acceptance (environmental acceptance, audit acceptance, planning acceptance, fire acceptance, lighting acceptance, electrical service acceptance, code compliance certificate)
  • Successfully manage the whole plant which include 3 main production lines: soft capsules, probiotics and solid preparations; 10 sets of independent HVAC systems to meet the temperature and humidity requirements for different product requirements
  • Successfully applied the RMP registration and passed all the auditing process
  • Complete all equipment commissioning and validation plan, develop daily and preventative maintenance plan, carry out air balance and air quality test, and communicate with air lab engineers for detailed report drafting
  • Accurately tracking all the expenses and optimize the cost savings, carry out regular safety inspections and make improvement for higher efficiency
  • Maintain good relationship with material supplier and service provider, including purchasing plan communication and new production line development
  • Organize scheduled meeting with contractors and subcontractors to make sure the full control and accurate understanding of the project progress
  • Deliver H&S training on site and review H&S documents

Project Engineer

NHS Pharmaceutical
Manukau, Auckland
05.2019 - 12.2020
  • Review Engineering Plans including power distribution plan, HVAC design layout, lighting and EML design, security and alarm systems etc
  • Response to equipment & facilities breakdown and answer front-line questions, Provide technical solutions for routine maintenance and shutdown activities
  • Work with production team and develop SOP for good machine operation practice
  • Prepare engineering documents including operation SOP, Preventative Maintenance Report, Engineering maintenance request, Calibration Schedule etc.
  • Work with engineers from suppliers to install and commissioning new production lines, and complete IQ OQ PQ report for production line equipment, HVAC systems, air compressor and water purifying system
  • Prepare H&S documents including JSA, Site Induction, Machine Safety Report and Hazard Analysis Report; Organize safety training to contractors and visitors

Design Engineer

Ventia
Ponsonby, Auckland
07.2016 - 04.2019
  • Deliver hundreds of optical fibre network designs for Chorus UFB (Ultra-fast broadband) project using AutoCAD, ArcGIS, Viscore, Emap, Geomaps, BeforeUdig etc.
  • Prepare construction report including Bill of Material, Bill of Quantity, Pricing Matrix and pole data sheet
  • Troubleshooting and rectify fiber network drawings and designs with innovative approach according to standard
  • Build MDU, SDU and ROW network as per design to fulfill client requirements in compliance with health & safety
    protocols, standard of UFB design and council requirements
  • Provide detailed technical support for fibre network deployments

Network Designer

Axin Global
Manukau, Auckland
11.2014 - 06.2016
  • Structured network planning and tactical plan development
  • Onsite scoping for potential risks and update existing network systems into database
  • Deliver detailed fiber design using AutoCAD and GIS applications

Education

Bachelor of Electrical Engineering -

Auckland University of Technology
11.2014

Skills

  • Communicate effectively and professionally, at technical and commercial level with internal and external clients (written and verbal)
  • AutoCAD 2D design
  • ArcGIS
  • Lighting design using DIALux
  • Electrical and HVAC schematic
  • PLC programming
  • Microsoft office suite
  • Odoo ERP system
  • WrokflowMax
  • Project management skills including time management, problem solving, risk control and leadership

Timeline

Electrical Engineer Technician

Acclaim Electrical
09.2021 - Current

Project Manager

NHS Pharmaceutical
01.2021 - 09.2021

Project Engineer

NHS Pharmaceutical
05.2019 - 12.2020

Design Engineer

Ventia
07.2016 - 04.2019

Network Designer

Axin Global
11.2014 - 06.2016

Bachelor of Electrical Engineering -

Auckland University of Technology
Terry Sun