Summary
Overview
Work History
Education
Skills
Qulifications
References
Timeline
Generic

Antonio Sebastian Valentino Henare

Greenlane

Summary

Determined Scaffolder taking on challenges and working at extreme heights. Willing to step up and help out when needed in various capacities. Offering decision making and organizational skills.

Skilled Scaffold Builder with experience in constructing and dismantling scaffolding for various construction projects. Strengths include knowledge of safety measures, ability to read blueprints, and exceptional manual dexterity. Notably improved efficiency and adherence to regulatory standards in previous roles. Capable of managing teams and ensuring timely project completion.

Overview

7
7
years of professional experience

Work History

Scaffold Builder

Stanton LTD.
09.2021 - 05.2023

Same as above.

Scaffold Builder

Superior Scaffolds
01.2020 - 04.2021
  • Assisted in the dismantling of scaffold structures after completion of job.
  • Transported tools, supplies, and materials needed for erecting or dismantling scaffolds using hand trucks or forklifts.
  • Replaced faulty components during maintenance checks to ensure safe operation of all systems.
  • Set up staging areas for materials and tools used in construction projects involving scaffolding.
  • Installed guardrails, planks, ladders, and other safety equipment on scaffolds.
  • Reviewed blueprints and specifications to determine job requirements.
  • Assembled and erected scaffolding components according to blueprints, drawings, and instructions.
  • Followed safety protocols such as wearing a hard hat, gloves, and steel-toed boots while working on high elevations.
  • Ensured that workers were trained in proper safety procedures before being allowed access to any elevated worksite utilizing a scaf.
  • Inspected scaffolding for structural integrity prior to use.
  • Tied off all loose ends when constructing or deconstructing a scaffold structure with rope, wire ropes, chains to ensure stability.
  • Safely constructed hung, tube and clip and modular scaffolding systems.
  • Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
  • Repaired and replaced faulty or damaged scaffold materials.
  • Checked material inventories and ordered new items as needed to prevent shortages.
  • Cleaned and organized work areas to prevent accidents and dangerous situations.
  • Read and utilized blueprints for correct scaffolding construction.
  • Cut down boards and plywood panels to meet appropriate size requirements.
  • Broke down structures following project completion.
  • Analyzed base surfaces to identify potential obstructions or safety hazards.
  • Constructed scaffolds in appropriate positions and secured completed structures in place.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.
  • Utilized various tools, equipment, materials and forming systems to complete construction tasks.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Removed damaged or defective parts or sections of structures and repaired or replaced using hand tools.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
  • Worked independently on projects and tasks within carpentry team.
  • Consistently constructed square and level projects.
  • Bore boltholes in wood, masonry or concrete using electric or pneumatic drill.
  • Adhered to project blueprints and requirements to deliver quality work.
  • Coordinated with subcontractors to work specialty areas, heating or electrical wiring work.
  • Erected scaffolding to assemble above-ground structures.
  • Verified trueness of construction using plumb and level.

Scaffolder

Pure Scaffolding
Auckland CBD
10.2018 - 12.2019
  • Followed safe working practices at all times while erecting and dismantling scaffolds.
  • Inspected scaffold components to ensure they were in good working condition.
  • Loaded and unloaded scaffold components from vehicles safely.
  • Maintained records of work completed and reported any damage or defects identified.

Ports of Auckland

Wallace Investments
CBD
04.2018 - 09.2019
  • Conducted testing of software and systems to ensure quality and reliability.
  • Prioritized and organized tasks to efficiently accomplish service goals.
  • Collaborated closely with team members to achieve project objectives and meet deadlines.
  • Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.
  • Managed time effectively to ensure tasks were completed on schedule and deadlines were met.
  • Completed day-to-day duties accurately and efficiently.
  • Worked effectively in team environments to make the workplace more productive.

Steel Fixer

Magneto Reinforcement Sub-Contracting to MAKO
11.2016 - 03.2017
  • Read and interpret blueprints to determine the type, size, and amount of steel needed for a project.
  • Inspect assembled steel structures for any defects before final approval is given by supervisor.
  • Check formwork for accuracy prior to pouring of concrete into it.

Customer Service Representative

The warehouse
Sylvia Park
08.2016 - 11.2016
  • Managed household errands and other essential duties.
  • Completed day-to-day duties accurately and efficiently.
  • Recognized by management for providing exceptional customer service.
  • Identified needs of customers promptly and efficiently.

Education

NCEA Lvl 2 - The Gateway Program

Glendowie College
Glendowie
12-2017

Skills

  • Scaffold assembly
  • Blueprint interpretation
  • Safety compliance
  • Equipment maintenance
  • Structural inspection
  • Material handling
  • Team collaboration
  • Problem solving
  • Time management
  • Quality assurance
  • Inventory management
  • Worksite organization
  • Communication skills
  • Hazard analysis
  • Multitasking capacity
  • Mentoring and training
  • Interpersonal skills
  • Crew management
  • Scaffolding erecting
  • Safety procedures
  • Material assessment
  • System scaffolding
  • Fall protection
  • Power tool maintenance and care
  • Electrical basics
  • Adaptability and flexibility
  • General laborer
  • Scaffolding construction
  • Repair structures
  • Multitasking and prioritization
  • Physical stamina
  • Physical activity
  • Estimate materials requirements
  • Interpreting blueprints
  • Site cleanup
  • Structural assessment
  • Multitasking Abilities
  • Hand and power tools
  • Teamwork
  • Build supports
  • Scaffolding set up
  • Power tools proficiency
  • Residential scaffolding
  • Team oversight
  • Hand and power tool operation
  • Scaffold inspection
  • Teamwork and collaboration

Qulifications

  • Full License (DT521419
  • Construct safe (020-0487-466)
  • Working at heights

References

References available upon request.

Timeline

Scaffold Builder

Stanton LTD.
09.2021 - 05.2023

Scaffold Builder

Superior Scaffolds
01.2020 - 04.2021

Scaffolder

Pure Scaffolding
10.2018 - 12.2019

Ports of Auckland

Wallace Investments
04.2018 - 09.2019

Steel Fixer

Magneto Reinforcement Sub-Contracting to MAKO
11.2016 - 03.2017

Customer Service Representative

The warehouse
08.2016 - 11.2016

NCEA Lvl 2 - The Gateway Program

Glendowie College
Antonio Sebastian Valentino Henare