Summary
Overview
Work History
Education
Skills
Certification
Work Availability
Timeline
TruckDriver

James Juan

Transmission line Mechanic
Upper Hutt,WGN

Summary

Adept at live line maintenance and enhancing system reliability, I significantly improved transmission efficiency at Ventia. My expertise in condition assessment and preventive maintenance, combined with strong communication skills, fosters teamwork and safety. Achievements include streamlining repair processes and reducing outage times, showcasing my ability to multitask and organize effectively.

Transmission line professional with thorough understanding of power grid maintenance and repair. Known for delivering reliable results through meticulous inspection and repair techniques. Valued for collaborative spirit and ability to adapt to dynamic work environments while prioritizing safety and efficiency.

Overview

27
27
years of professional experience
1
1
Certification

Work History

Transmission Line Mechanic

Ventia
10.2012 - Current
  • Enhanced transmission line reliability by performing routine maintenance and repairs.
  • Responded promptly to emergency situations involving power outages or hazardous conditions, ensuring public safety and minimal downtime.
  • Reduced outage times by quickly identifying and addressing issues with transmission lines.
  • Supported efficient project completion by coordinating closely with other departments, including engineering and construction teams.
  • Safeguarded the integrity of the power grid by carrying out timely corrective actions when necessary.
  • Maintained accurate records of all maintenance and repair activities, ensuring proper documentation for future reference.
  • Streamlined workflow processes within the team through effective communication both verbally and written.
  • Demonstrated strong technical skills while working with diverse types of electrical equipment, machinery, and hand tools.
  • Increased efficiency in repair work by utilizing advanced tools and techniques for diagnosing problems.
  • Completed challenging projects on time, adhering to strict deadlines in high-pressure situations.

Distribution Linesman

CE Electric UK/Voltcom Limited
05.2011 - 08.2011
  • Contributed to cost savings by recommending upgrades or replacements that minimized energy loss.
  • Strengthened communication within team through effective coordination with supervisors, dispatchers, and fellow linemen during daily operations.
  • Developed expertise in various types of equipment used in line work, including aerial lifts and digger derricks, enhancing overall efficiency on the job site.
  • Maintained compliance with safety regulations, attending regular training sessions and applying updated knowledge on the job.
  • Improved system reliability by maintaining and repairing overhead electrical lines and equipment.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Removed old poles and hardware and replaced with new equipment.
  • Worked on both dead and energized lines.

Transmission Lineman

Balfour Beaty Power Networks
04.2010 - 11.2010
  • Performed maintenance and reconducting work in varied weather conditions.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Worked on both dead and energized lines.
  • Removed old poles and hardware and replaced with new equipment.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Participated in ongoing training programs to stay current on industry trends and best practices.
  • Improved workplace safety by conducting regular equipment inspections and maintenance.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Assisted in emergency storm restoration efforts, restoring power to affected communities as quickly as possible.

LV and HV Distribution Linesman

Carillion Utility Services
12.2008 - 04.2009
  • Strengthened communication within team through effective coordination with supervisors, dispatchers, and fellow linemen during daily operations.
  • Minimized environmental impact during operations through careful planning and execution of vegetation management techniques near power lines.
  • Contributed to cost savings by recommending upgrades or replacements that minimized energy loss.
  • Demonstrated adaptability and resourcefulness when faced with unexpected challenges, finding creative solutions to keep projects on track.
  • Supported system expansion projects, installing new poles and transformers as needed for network growth.
  • Protected the public from potential hazards by promptly addressing downed wires or other dangerous conditions near power lines.
  • Improved system reliability by maintaining and repairing overhead electrical lines and equipment.

Transmission Linesman

Balfour Beaty Power Networks
03.2007 - 10.2008
  • Strengthened communication within team through effective coordination with supervisors, dispatchers, and fellow linemen during daily operations.
  • Promoted a culture of safety among peers by modeling responsible behavior at all times while working around high-voltage systems.
  • Streamlined work processes by adhering to established procedures for both routine maintenance tasks and emergency repairs.
  • Demonstrated adaptability and resourcefulness when faced with unexpected challenges, finding creative solutions to keep projects on track.
  • Protected the public from potential hazards by promptly addressing downed wires or other dangerous conditions near power lines.
  • Improved system reliability by maintaining and repairing overhead electrical lines and equipment.
  • Maintained compliance with safety regulations, attending regular training sessions and applying updated knowledge on the job.

Transmission Linesman

National Power Corporation
02.2000 - 03.2007
  • Minimized environmental impact during operations through careful planning and execution of vegetation management techniques near power lines.
  • live line maintenance
  • Supported system expansion projects, installing new poles and transformers as needed for network growth.
  • Optimized performance by troubleshooting complex issues related to electrical distribution systems and transformers.
  • Facilitated successful cross-functional collaboration with engineering teams during large-scale construction projects involving multiple utility services.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.

Apprentice Linesman

National Power Corporation
08.1997 - 12.1999
  • Improved system reliability by performing routine maintenance on overhead and underground power lines.
  • Performed preventive maintenance measures such as vegetation management around power lines and equipment inspections.
  • Increased customer satisfaction through prompt response to outages and service requests, restoring power as quickly as possible.
  • Supported ongoing professional development by participating in training programs and staying current on industry advancements.
  • Minimized downtime for customers by efficiently replacing faulty transformers, switches, and fuses.

Education

No Degree - Police Science Technology

Northwestern University
Laoag City, Philippines
05-1993

Skills

  • Live Line Maintenance
  • Condition Assessment of Power Line Asset
  • Line Patrol
  • Line maintenance techniques
  • Transmission line construction
  • Overhead line repair
  • Time management
  • Multitasking and organization
  • Preventive maintenance services
  • Safety protocols and procedures
  • Verbal and written communication
  • Safety awareness
  • Power system analysis
  • Insulator testing

Certification

Registered Line Mechanic New Zealand

EWRB Registration Number: LM261947

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Transmission Line Mechanic

Ventia
10.2012 - Current

Distribution Linesman

CE Electric UK/Voltcom Limited
05.2011 - 08.2011

Transmission Lineman

Balfour Beaty Power Networks
04.2010 - 11.2010

LV and HV Distribution Linesman

Carillion Utility Services
12.2008 - 04.2009

Transmission Linesman

Balfour Beaty Power Networks
03.2007 - 10.2008

Transmission Linesman

National Power Corporation
02.2000 - 03.2007

Apprentice Linesman

National Power Corporation
08.1997 - 12.1999

No Degree - Police Science Technology

Northwestern University
James JuanTransmission line Mechanic