Team leader in numerous projects to extend power grid for Network owners in Fiji ( EFL ), projects would include the Installation of 500 plus poles both concrete and wooden poles, the carting and manual erection of Power poles up to 17 mts in areas inaccessible to Machinery and vehicles. The dressing and installation of crossarm and other pole hardware to Coinside with the build, this includes reading and interpretation of the plans and schematics of the build, installation and wiring of pole mount TX up to 500 kva mounted on H structures, the installation of earthing for this Transformers, vegetation management which require a 60 mtr diameter clearance of trees that require removal.
Carry out safety briefings and tool box meetings for the team.
Also have experience in restoration work due to natural disaster strikes ( this was on a yearly basis )
Truck mounted borer and crane operator with the augering and installation of close to 1000 poles under my belt.
Poles and crossarms replacements etc
Very skilled with a chainsaw.