Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Marlon Del Rosario

Auckland,31c Nearco St.Randwick Park,Manukau

Summary

Quality-focused Carpenter committed to following safety code regulations. Timely and efficient working style takes difficult jobs through to completion within budget. Experienced in both residential and commercial construction.

Overview

26
26
years of professional experience
1
1
Certification

Work History

CARPENTER

EVERGREEN MODULAR LTD
05.2023 - 05.2024
  • Inspection for squareness of frame works to be sheeted, double check measurements of frame work as per instruction by the supervisor.
  • Sheet cutting ply wood and gypsum board preparations for frame elements.
  • Performed sheeting works, ply wood and gypsum board installation.
  • Frame works assembly of walls, floors and ceiling elements.
  • CONQA documentations, before and after elements assembly.
  • Lifting of finished elements via remote controlled overhead crane to the next stage of construction.
  • Maintained clean and organised workplace to optimized performance, efficiency and safety.

CARPENTER GENERAL/ CARPENTER LEAD.

NECO Construction Company Inc,
05.2018 - 05.2022
  • Formworks carpentry, boxing of columns, Foundation, post, beams and retaining walls includes concreting of every formwork and stripping of forms.
  • Installed building elements such as wooden posts, wall frames [metal and wood] and roof members.
  • performed roofing works, thin sheet and tigula roofs, gutter installation.
  • sheeting works such as ply and gypsum board installations, acoustic ceiling installation.
  • Installed metal and wooden doors and jambs, louvers and glass windows.
  • Dry wall painting works.
  • Fixed tiles, granite and counter tops.
  • CHB installation, plastering and pebble finished concrete floors and walls.

FOREMAN

Local Government Office.
09.2014 - 03.2016
  • Tool box meeting for every day scope of work, priorities and safety on site awareness.
  • Designate manpower accordingly.
  • Analyze plan details and solving problems on Do methodology analysis.
  • Prioritize the advance ordering of materials needed for the project.
  • Daily report to the project engineer and managers for day to day accomplishments, near miss incidents and plans for the next day work.
  • Ensure time frame schedule will be meet by advance planning by properly coordinating with the overhead staff.

CARPENTER/ MASON

LGU Municipal Government
04.2010 - 05.2013
  • Formworks carpentry for concreting o road projects, housing projects, commercial establishments.
  • Truss member assembly, thin roof installations.
  • Dry wall partitions, curtain walls and ceiling installations.
  • Fabricate wooden doors and jambs fo school projects.
  • Repair and renovation works of municipal building projects.
  • CHB installations, Plastering of walls.
  • Tiles, granite and road bricks installations.


COMPANY ELECTRICIAN

Princessa Holiday Resort
07.1999 - 10.2001
  • Maintained buildings, electrical equipments, appliances, generators and company services.
  • purchase electrical materials, generator fuels and parts for maintenance purposes.
  • Installed electrical wirings at newly proposed multi function building project.
  • Operate sound system for day and night resorts functions for guests affairs and walk in visitors at function hall.

SERVICE TECHNICIAN

CITI Appliance Phils.
08.1998 - 07.1999
  • Costumer assistance for unit demonstrations.
  • Electrical building maintenance.
  • Repair defective units in warranty and out of warranty period.
  • report directly to the supervisor about costumer complains and home service assistance.
  • Delivery of appliances to the costumer for proper installations and unit demonstrations and testing of newly purchase units as well.

Education

No Degree - Vocational-Technical Education

GUZMAN INSTITUTE of ELECTRONICS
Quiapo Area, Manila, Phil.
10.1994

Skills

  • Form works
  • Framing Construction
  • Finish Carpentry
  • Hand and power tools
  • Cabinet making
  • Mason
  • Roofer
  • Gypsum board installation
  • House painter
  • Pluming works
  • Electrical works
  • Blue print detailing and execution
  • Project layout

Certification

  • NC II for CARPENTRY issued April 18, 2018
  • INTRODUCTION TO LOAD SLINGING AND OVERHEAD CRANE [pendant controlled] COURSE. Date of issue; 17-06-2023

Timeline

CARPENTER

EVERGREEN MODULAR LTD
05.2023 - 05.2024

CARPENTER GENERAL/ CARPENTER LEAD.

NECO Construction Company Inc,
05.2018 - 05.2022

FOREMAN

Local Government Office.
09.2014 - 03.2016

CARPENTER/ MASON

LGU Municipal Government
04.2010 - 05.2013

COMPANY ELECTRICIAN

Princessa Holiday Resort
07.1999 - 10.2001

SERVICE TECHNICIAN

CITI Appliance Phils.
08.1998 - 07.1999

No Degree - Vocational-Technical Education

GUZMAN INSTITUTE of ELECTRONICS
Marlon Del Rosario